Paper |
Title |
Page |
THPTS065 |
Analysis on the Thermal Response to Beam Impedance Heating of the Post Ls2 Proton Synchrotron Beam Dump |
4260 |
|
- L. Teofili, F. Giordano, I. Lamas, F.-X. Nuiry, G. Romagnoli, B. Salvant
CERN, Meyrin, Switzerland
- M. Marongiu, M. Migliorati
Sapienza University of Rome, Rome, Italy
|
|
|
The High Luminosity Large Hadron Collider (HL-LHC) and the LIU (LHC-Injection Upgrade) projects at CERN are upgrading the whole CERN accelerators chain, increasing beam brightness and intensity. In this scenario, some critical machine components have to be redesigned and rebuilt. Due to the increase in beam intensity, minimizing the electromagnetic interaction between the beam and the device is a crucial design task. Indeed, these interactions could lead to beam instabilities and excessive thermo-mechanical loadings in the device. In this context, this paper presents an example of multi-physics study to investigate the impedance related thermal effects. The analysis is performed on the conceptual design of the new proton synchrotron (PS) internal dump.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS065
|
|
About • |
paper received ※ 26 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|