Author: Tamura, J.
Paper Title Page
MOPGW040 Beam Optics Design of the Superconducting Region of the JAEA ADS 181
 
  • B. Yee-Rendón, Y. Kondo, F.M. Maekawa, S.I. Meigo, J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  The Japan Atomic Energy Agency (JAEA) is proposing an Accelerator Driven Subcritical System (ADS) for the transmutation of the nuclear waste. ADS will consist of a superconducting CW proton linear accelerator of 30MW and a subcritical nuclear reactor core. The main part of the acceleration will take part in the superconducting region using five types of radio frequency cavities. The ADS operation demands a high intensity and reliability of the beam. Therefore, the beam optics design plays a fundamental role to reduce the beam loss, control emittance growth and beam halo.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW040  
About • paper received ※ 17 April 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS049 The First Replacement of the RF Window of the ACS Cavity 971
 
  • J. Tamura, Y. Kondo, T. Morishita
    JAEA/J-PARC, Tokai-mura, Japan
  • F. Naito, M. Otani
    KEK, Tokai, Ibaraki, Japan
  • Y. Nemoto
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
 
  In 2013, the Annular-ring Coupled Structure (ACS) cavities were installed to the Japan Proton Accelerator Research Complex (J-PARC) linac. Since then, the ACS cavities have been stably running. Although any serious problem induced by the ACS RF window has not yet observed, we decided to replace the RF window of one ACS cavity, which is the eighteenth accelerating cavity in the order of beam energy (ACS18), by the newly manufactured one. The major motivations of the replacement are to check the surface condition of the RF window which have been under operation for nearly five years and to confirm the availability of the newly manufactured RF window. By making use of the summer maintenance period of 2018, we carried out the replacement. This was the first experience for us to replace the RF window installed to the ACS cavity in the linac accelerator tunnel. As for the removed RF window, there was no any abnormal warning found with the visual examination. At the starting up of the cavity’s operation after the maintenance period, we investigated how much time would be required for an RF conditioning. It took around fifty hours so that the peak RF power including the beam loading is stably input to the cavity through the new RF window. The ACS cavity with the new RF window is now stably operating.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS049  
About • paper received ※ 01 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS050 VSWR Adjustment for ACS Cavity in J-PARC LINAC 974
 
  • J. Tamura, Y. Kondo, T. Morishita
    JAEA/J-PARC, Tokai-mura, Japan
  • F. Naito, M. Otani
    KEK, Tokai, Ibaraki, Japan
  • Y. Nemoto
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
 
  In the Japan Proton Accelerator Research Complex (J-PARC) linac, negative hydrogen beams are accelerated from 190 MeV to 400 MeV by twenty-one Annular-ring Coupled Structure (ACS) accelerating cavities. The input coupler of the ACS high-beta cavity, which is the 21st accelerating cavity (ACS21) in the order of beam acceleration, had a comparatively larger value of the Voltage Standing Wave Ratio (VSWR) than those of the other ACS cavities. To adjust the VSWR of the ACS21, we designed and fabricated a rectangular waveguide with a capacitive iris which conduces to a better matching between the cavity and the waveguide. In the 2018 summer maintenance period, we installed the newly fabricated waveguide to the ACS21 in the position between the input coupler and the RF window. Consequently, the VSWR of the ACS21 was successfully decreased to the target value which leads to the critical coupling under the nominal accelerating condition with 50-mA peak beam current.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS050  
About • paper received ※ 01 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS027 Progress of J-PARC LINAC Commissioning 1990
 
  • Y. Liu
    KEK/JAEA, Ibaraki-Ken, Japan
  • Z. Fang, K. Futatsukawa, T. Miyao, M. Otani, T. Shibata
    KEK, Tokai, Ibaraki, Japan
  • T. Ito, A. Miura, T. Morishita, K. Moriya, K. Okabe, J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  After energy and intensity upgrade to 400MeV and 50mA respectively, J-PARC linac were ready for 1 MW beam power from RCS. J-PARC is now successfully operated at 50mA/400MeV for 500kW at neutron target, and on the way to 1MW. The next milestones 1.2 and 1.5MW from RCS are relying on feasibility and property of increase of peak current to 60 mA and the pulse width to 600us in linac. Beam studies were carried out at linac to study the initial beam parameters from ion source/RFQ, to find the optimized lattice and matching, to clarify beam loss source and to mitigate the loss/residue dose for the power upgrade.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS027  
About • paper received ※ 17 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB028 Electromagnetic Design of the Low Beta Cavities for the JAEA ADS 2870
 
  • B. Yee-Rendón, Y. Kondo, F.M. Maekawa, S.I. Meigo, J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  The Japan Atomic Energy Agency (JAEA) is designing a superconducting CW proton linear accelerator for the ADS project. The superconducting region will use five types of radio frequency cavities. In the region from 2 to 180 MeV the acceleration will be done using Half Wave Resonator (HWR) and Single Spokes (SS) cavities. HWR cavities will accelerate the beam from 2 to 10 MeV with a geometrical beta of 0.08 and the SS ones will do from 10 to 180 MeV using two cavity families with geometrical betas of 0.16 and 0.43. The results of electromagnetic model design are presented and the comparison with similar cavities from other projects are included.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB028  
About • paper received ※ 19 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB029 Design of the Elliptical Superconducting Cavities for the JAEA ADS 2873
 
  • B. Yee-Rendón, Y. Kondo, F.M. Maekawa, S.I. Meigo, J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  The superconducting CW proton linear accelerator for an Accelerator Driven Subcritical System (ADS) proposed by Japan Atomic Energy Agency (JAEA) employs elliptical cavities for the final acceleration of 180 MeV to 1.5 GeV. Since this energy region implies a change of beta from 0.55 to 1, two cavity models were developed using the geometrical betas of 0.68 and 0.89 to improve the acceleration efficiency. The study of the electromagnetic design was simulated using SUPERFISH (SF) code and python program to do variable scan, the results were benchmarked with CST Microwave Studio program (CST).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB029  
About • paper received ※ 18 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)