Author: Shobuda, Y.
Paper Title Page
MOPGW035 Coupling Impedance of the Collimator Without RF-Shields at the RCS in J-PARC 163
 
  • Y. Shobuda, J. Kamiya, K. Moriya, K. Okabe
    JAEA/J-PARC, Tokai-mura, Japan
 
  All holes on the chamber walls of synchrotrons should be filled with the radiofrequency (RF)-shields to suppress coupling impedances that excite beam instabilities. In a synchrotron, titanium nitride (TiN)-coated RF-shields are installed with collimators. If the holes, through which the collimator jaw enters and exits the chamber, are filled with such RF-shields, the shields may break down as the dynamic coefficient of TiN increases in vacuum. At the Rapid Cycling Synchrotron (RCS), the RF-shields are eliminated from the collimator after demonstrating that the effect due to the RF-shields is negligible on the impedance at low frequencies.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW035  
About • paper received ※ 28 April 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPGW037 Dynamic Variation of Chromaticity for Beam Instability Mitigation in the 3-GeV RCS of J-PARC 171
 
  • P.K. Saha, H. Harada, H. Hotchi, Y. Shobuda, T. Takayanagi, F. Tamura, Y. Watanabe
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  We have studied many other dynamic approaches from that reported in the IPAC 2018 for transverse beam instability mitigation in the presence of strong space charge in the 3-GeV RCS of J-PARC. One of such a method is the introduction of an excess of chromaticity from that of natural chromaticity by reversing the sextupole magnetic fields from the middle of the acceleration cycle. The benifits of this method are twofold. It allows to utilize sextupole for chromaticty correction at lower energy and also mitigate the beam instability at higher energy because of introducing higher chromaticity. We first carried out numerical simulations by using ORBIT code, experimentally verified and then applied for the machine operation. The detail of simulation and measurements results are presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW037  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP013 New Design of Vacuum Chambers for Radiation Shield Installation at Beam Injection Area of J-PARC RCS 1255
 
  • J. Kamiya, K. Kotoku, Y. Shobuda, T. Takayanagi, K. Yamamoto, T. Yanagibashi
    JAEA/J-PARC, Tokai-mura, Japan
  • K. Horino, N. Miki
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
 
  One of the issues in the J-PARC 3 GeV rapid cycling synchrotron is the high residual radiation dose around the beam injection point. A radiation shield is necessary to reduce radiation exposure of workers when maintenance is performed there. A space to install the radiation shield should be secured by newly designing a structure of the vacuum chamber at the injection point and the alumina ceramics beam pipes for the shift bump magnets. To make the space for the shield, the chamber is lengthened along the beam line and the cross-sectional shape is changed from circle to rectangle. The displacement and inner stress of the vacuum chamber due to atmospheric pressure was evaluated to be enough small by the calculation. For the ceramics beam pipe’s rf-shield, the damping resistor was effective to reduce the induced modulation voltages by the pulsed magnetic field.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP013  
About • paper received ※ 29 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)