Paper | Title | Page |
---|---|---|
MOPTS103 | First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport | 1118 |
|
||
The European Spallation Source (ESS), currently under construction in Lund, Sweden, will be a spallation neutron source driven by a proton linac of an unprecedented 5 MW beam power. Such a high power requires its ion source (IS) to produce proton beam pulses at 14 Hz with a high peak current more than 62.5 mA and a long plateau up to §I{3}{ms}. The IS and the following low energy beam transport (LEBT) section were manufactured and tested with beam to meet ESS requirements at INFN-LNS and delivered to ESS towards the end of 2017. Beam commissioning of these two sections on the ESS site has started in September 2018 and will continue until the end of June 2019. This paper provides an overview on this first beam commissioning period at ESS and also presents results of IS characterization and testing on LEBT functionalities. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS103 | |
About • | paper received ※ 20 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPGW076 | Initial Performance of the Beam Instrumentation for the ESS IS & LEBT | 2650 |
|
||
The European Spallation Source (ESS) is currently under construction in Lund (Sweden), and its 5 MW of average beam power at repetition rate of 14 Hz will make it five times more powerful than other pulsed neutron-scattering facilities. High-energy neutrons will be produced via spallation by 2 GeV protons on a tungsten target. A complete suite of beam diagnostics will enable tuning, monitoring and protection of the proton accelerator during commissioning, studies and operation. As an initial step toward neutron production, the Ion Source (ISrc) and the 75keV Low Energy Beam Transport Line (LEBT) have been installed. For the commissioning and characterization of this first beam-producing system, a subset of the ISrc and LEBT diagnostics suite has been deployed. This includes the following equipment: a Faraday cup, beam current transformers, an Allison Scanner emittance measurement unit, beam-induced fluorescence monitors, and a Doppler-shift spectroscopy system. Beam instrumentation deployment and performance verification, as well as the operational experience during the initial beam commissioning, will be presented. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW076 | |
About • | paper received ※ 17 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPTS107 | Designing the European Spallation Source Tuning Dump Beam Imaging System | 3374 |
|
||
Funding: In-Kind Agreement, ESS/Norway The first section of the European Spallation Source (ESS) to receive high-energy protons when live operation begins will be the Tuning Dump beam-line. The dump line will be used during accelerator commissioning to tune the linac, and must accept the full range of ESS energies up to 2 GeV, from 5µs probe pulse to full 2.86ms pulse length, and beam sizes up to the 250 mm limit of the physical aperture, although the allowed pulse rate will be restricted by the thermal capacity of the dump. An imaging system has been developed to view remotely the transverse beam profile in the section immediately before the dump entrance, using insertable scintillator screens. This contribution presents the principal design parameters for this system, with particular reference to the techniques used in assessing the radiation and thermal environments and their impact on the selection of locations for the imaging cameras, and the specification of the mechanical screen actuators. The predicted optical performance of the system is also summarised. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS107 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |