Paper |
Title |
Page |
WEPTS040 |
Energy Dependence of the Reproducibility and Injection Efficiency of the LINAC3-LEIR Complex |
3188 |
|
- S. Hirlaender
ATI, Vienna, Austria
- H. Bartosik, G. Bellodi, N. Biancacci, V. Kain, Á. Saá Hernández, R. Scrivens
CERN, Geneva, Switzerland
|
|
|
High intensities in the CERN Low Energy Ion Ring (LEIR) are achieved by stacking several multi-turn injections from the pre-accelerator LINAC3. Up to seven consecutive 200 μs long, 200 ms spaced pulses are injected from LINAC3 into LEIR. An inclined septum magnet combined with a collapsing horizontal orbit bump allows a 6-D phase space painting via a linearly ramped mean momentum along with the LINAC3 pulse and injection at high dispersion. The injected energy distribution measured by the LEIR longitudinal Schottky is correlated with the obtained injection efficiency in this paper. Studies in 2018 revealed that the achievable accumulated intensity of LEIR strongly depends on the longitudinal distribution from LINAC3, which does not stay constant. This paper summarises the experimental results and means to further improve reproducibility and high injection efficiency.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS040
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THXPLM1 |
LHC Injectors Upgrade Project: Towards New Territory Beam Parameters |
3385 |
|
- M. Meddahi, R. Alemany-Fernández, H. Bartosik, G. Bellodi, J. Coupard, H. Damerau, G.P. Di Giovanni, F.B. Dos Santos Pedrosa, A. Funken, B. Goddard, K. Hanke, A. Huschauer, V. Kain, A.M. Lombardi, B. Mikulec, S. Prodon, G. Rumolo, R. Scrivens, E.N. Shaposhnikova
CERN, Geneva, Switzerland
|
|
|
The LHC injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC injectors in order to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring high availability and reliable operation of the injectors complex up to the end of the HL-LHC era (ca. 2035). This requires extensive hardware modifications and new beam dynamics solutions in the entire LHC proton and ion injection chains: the new Linac4, the Proton Synchrotron Booster, the Proton Synchrotron the Super Proton Synchrotron together with the ion PS injectors (the Linac3 and the Low Energy Ion Ring). All hardware modifications will be implemented during the 2019-2020 CERN accelerators shutdown. This talk would analyze the various project phases, share the lessons learned, and conclude on the expected beam parameter reach, together with the related risks.
|
|
|
Slides THXPLM1 [20.029 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THXPLM1
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|