TUPGW011 Status of the PETRA IV project 1404
 
  • I.V. Agapov, R. Bacher, M. Bieler, R. Bospflug, R. Brinkmann, Y.-C. Chae, H.C. Chao, H.T. Duhme, M. Ebert, H.-J. Eckoldt, H. Ehrlichmann, X.N. Gavaldà, M. Hüning, U. Hurdelbrink, J. Keil, J. Klute, M. Körfer, B. Krause, G. Kube, W. Leemans, L. Lilje, F. Obier, A. Petrov, N. Plambeck, J. Prenting, G.K. Sahoo, H. Schlarb, M. Schlösser, F. Schmidt-Föhre, M. Schmitz, C.G. Schroer, T. Tempel, M. Thede, M. Tischer, R. Wanzenberg, E.F. Weckert, T. Wilksen, K. Wittenburg, J.X. Zhang
    DESY, Hamburg, Germany
 
  Since 2016 DESY has been pursuing R&D towards upgrading its PETRA synchrotron light source to a fourth-generation machine, PETRA IV, which is expected to start operation in 2027. The conceptual design of a 6 GeV seven-bend-achromat-based lattice with an approx. 10pm emittance along with critically important technical systems has been completed. We will present the status of the project, the expected parameter space of the facility, and lattice design and beam dynamics issues for the main ring.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW011  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)