TUPMP015 |
Magnet Power Supply Calibration with a Portable Current Measuring Unit at the J-PARC Main Ring |
1263 |
|
- K. Miura, Y. Kurimoto, Y. Morita, D. Naito, T. Oogoe, T. Shimogawa
KEK, Ibaraki, Japan
- Y. Kuniyasu
Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
- K. Ooya
SANKYU PLANT TECHNO CO., LTD., 6-5-3, Kachidoki, Japan
- R. Sagawa
Universal Engineering, Ibaraki-ken, Japan
|
|
|
In the J-PARC MR, 96 bending magnets (BMs) are used in total. They are divided into 6 groups of 16 BMs. The 16 BMs in each group are connected in series and driven by a single power supply. Since all 96 BMs are symmetrically located in the ring, the magnet currents regulated by the 6 power supplies need to be same. Each power supply performs output current feedback control using electronic circuits including analog amplifications and AD / DA conversions. Due to individual differences of the electronic circuits, output current is generally expected to be different for each power supply. Therefore, we developed a current measurement unit with the portable DCCT as an independent reference. Further, we measured the magnet currents regulated by the 6 BM power supplies using the unit. We report the details of the unit as well as the results of the current measurements.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP015
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMP016 |
New Power Supply of Main Magnets for J-Parc Main Ring Upgrade |
1266 |
|
- T. Shimogawa, Y. Kurimoto, K. Miura, Y. Morita, D. Naito
KEK, Ibaraki, Japan
- R. Sagawa
Universal Engineering, Ibaraki-ken, Japan
|
|
|
It is plans that the proton beam power provided to experimental facilities increase with shortening repetition period in J-PARC Main Ring (MR). As the shorten repetition period, the replacement of the power converters for main magnets in J-PARC MR is necessary to cope with issues such as power fluctuation of the main grid and increase of the output voltage. We have considered and developed the power converters with a 10 MW class which have the capacitor banks with the large capacitance. In the end of 2017, the first new power converter for a bending magnets family, which is the largest power converter in this upgrade plan, was installed in J-PARC site and the power test is ongoing using a dummy and a real load. In this report, the first new power converter for a bending magnets family in J-PARC MR is reported including the test results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP016
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|