Author: Pichoff, N.
Paper Title Page
WEPTS118 Results of CEA Tests of SARAF Couplers Prototypes 3382
 
  • G. Ferrand, Y. Baron, S. Bouaziz, D. Chirpaz-Cerbat, R. Cubizolles, F. Gohier, S. Ladegaillerie, A. Lotode, C. Madec, G. Monnereau, N. Pichoff, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • C. Boulch, E. Fayette, P. Guiho, Y. Lussignol, C. Servouin
    CEA-DRF-IRFU, France
 
  CEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 and 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz. The last two identical cryomodule will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The maximal required power to be transmitted to the beam is 11.4 kW for high-beta cavity couplers. This document presents the results of the coupler tests and conditioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS118  
About • paper received ※ 23 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS116 The SARAF-LINAC Project 2019 Status 4352
 
  • N. Pichoff, R.D. Duperrier, G. Ferrand, B. Gastineau, F. Gougnaud, M. Jacquemet, C. Madec, O. Piquet, Th. Plaisant, F. Senée, D. Uriot
    CEA-IRFU, Gif-sur-Yvette, France
  • D. Berkovits, J. Luner, A. Perry, E. Reinfeld
    Soreq NRC, Yavne, Israel
 
  SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC solenoid-Package have been tested recently. Meanwhile, the cryomodules technical specifications have been written and called for tender. This paper presents the status of the SARAF-LINAC Project at April 2019.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS116  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS117 Results of CEA Tests of SARAF Cavities Prototypes 4356
 
  • G. Ferrand, G. Jullien, S. Ladegaillerie, F. Leseigneur, C. Madec, N. Misiara, N. Pichoff, O. Piquet, L. Zhao
    CEA-IRFU, Gif-sur-Yvette, France
  • P. Carbonnier, F. Éozénou, E. Fayette, L. Maurice, C. Servouin
    CEA-DRF-IRFU, France
  • A. Pérolat
    CEA, Gif-sur-Yvette, France
 
  CEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons to 35 MeV or deuterons to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 & 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz, and the last two crymodules host 7 HWR medium beta cavities (β = 0.18). The low beta prototype was qualified, the medium beta is being qualified. The results of the RF tests will be presented in this poster.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS117  
About • paper received ※ 23 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)