TUPGW005 Preparation of the EBS Beam Commissioning 1388
 
  • S.M. Liuzzo, N. Carmignani, A. Franchi, T.P. Perron, K.B. Scheidt, E.T. Taurel, L. Torino, S.M. White
    ESRF, Grenoble, France
 
  In 2020 the ESRF storage ring will be upgraded to a Hybrid Multi Bend Achromat (HMBA) lattice. The commissioning of the new ring will require dedicated tools, either updated from the existing ones or newly developed. Most of the software and procedures were tested on the existing storage ring before its decommissioning. In particular we present experiments on first-turn steering and beam accumulation, check of magnet polarity and calibration, and injection tuning. The use of a control-system simulator proved to be crucial for the debugging of the software and the development of the new control system, as far as beam measurements and manipulations are concerned.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW005  
About • paper received ※ 26 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)