Author: Neri, L.
Paper Title Page
MOPTS103 First Results of Beam Commissioning on the ESS Site for the Ion Source and Low Energy Beam Transport 1118
 
  • R. Miyamoto, R.E. Bebb, E.C. Bergman, B. Bertrand, H. Danared, C.S. Derrez, E.M. Donegani, M. Eshraqi, J.F. Esteban Müller, T. Fay, V. Grishin, B. Gålnander, S. Haghtalab, H. Hassanzadegan, A. Jansson, H. Kocevar, E. Laface, Y. Levinsen, M. Mansouri, C.A. Martins, J.P.S. Martins, N. Milas, M. Muñoz, E. Nilsson, D.C. Plostinar, C. Rosati, T.J. Shea, A.G. Sosa, R. Tarkeshian, L. Tchelidze, C.A. Thomas, P.L. van Velze
    ESS, Lund, Sweden
  • I. Bergstrom
    CERN, Meyrin, Switzerland
  • L. Celona, L. Neri
    INFN/LNS, Catania, Italy
 
  The European Spallation Source (ESS), currently under construction in Lund, Sweden, will be a spallation neutron source driven by a proton linac of an unprecedented 5 MW beam power. Such a high power requires its ion source (IS) to produce proton beam pulses at 14 Hz with a high peak current more than 62.5 mA and a long plateau up to §I{3}{ms}. The IS and the following low energy beam transport (LEBT) section were manufactured and tested with beam to meet ESS requirements at INFN-LNS and delivered to ESS towards the end of 2017. Beam commissioning of these two sections on the ESS site has started in September 2018 and will continue until the end of June 2019. This paper provides an overview on this first beam commissioning period at ESS and also presents results of IS characterization and testing on LEBT functionalities.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS103  
About • paper received ※ 20 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)