MOPTS049 The First Replacement of the RF Window of the ACS Cavity 971
 
  • J. Tamura, Y. Kondo, T. Morishita
    JAEA/J-PARC, Tokai-mura, Japan
  • F. Naito, M. Otani
    KEK, Tokai, Ibaraki, Japan
  • Y. Nemoto
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
 
  In 2013, the Annular-ring Coupled Structure (ACS) cavities were installed to the Japan Proton Accelerator Research Complex (J-PARC) linac. Since then, the ACS cavities have been stably running. Although any serious problem induced by the ACS RF window has not yet observed, we decided to replace the RF window of one ACS cavity, which is the eighteenth accelerating cavity in the order of beam energy (ACS18), by the newly manufactured one. The major motivations of the replacement are to check the surface condition of the RF window which have been under operation for nearly five years and to confirm the availability of the newly manufactured RF window. By making use of the summer maintenance period of 2018, we carried out the replacement. This was the first experience for us to replace the RF window installed to the ACS cavity in the linac accelerator tunnel. As for the removed RF window, there was no any abnormal warning found with the visual examination. At the starting up of the cavity’s operation after the maintenance period, we investigated how much time would be required for an RF conditioning. It took around fifty hours so that the peak RF power including the beam loading is stably input to the cavity through the new RF window. The ACS cavity with the new RF window is now stably operating.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS049  
About • paper received ※ 01 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS050 VSWR Adjustment for ACS Cavity in J-PARC LINAC 974
 
  • J. Tamura, Y. Kondo, T. Morishita
    JAEA/J-PARC, Tokai-mura, Japan
  • F. Naito, M. Otani
    KEK, Tokai, Ibaraki, Japan
  • Y. Nemoto
    Nippon Advanced Technology Co., Ltd., Tokai, Japan
 
  In the Japan Proton Accelerator Research Complex (J-PARC) linac, negative hydrogen beams are accelerated from 190 MeV to 400 MeV by twenty-one Annular-ring Coupled Structure (ACS) accelerating cavities. The input coupler of the ACS high-beta cavity, which is the 21st accelerating cavity (ACS21) in the order of beam acceleration, had a comparatively larger value of the Voltage Standing Wave Ratio (VSWR) than those of the other ACS cavities. To adjust the VSWR of the ACS21, we designed and fabricated a rectangular waveguide with a capacitive iris which conduces to a better matching between the cavity and the waveguide. In the 2018 summer maintenance period, we installed the newly fabricated waveguide to the ACS21 in the position between the input coupler and the RF window. Consequently, the VSWR of the ACS21 was successfully decreased to the target value which leads to the critical coupling under the nominal accelerating condition with 50-mA peak beam current.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS050  
About • paper received ※ 01 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPRB117 Disk and Washer Coupled Cavity Linac Design and Cold-Model for Muon Linac 1924
 
  • M. Otani, N. Saito
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
  • K. Futatsukawa, T. Mibe, F. Naito
    KEK, Ibaraki, Japan
  • K. Hasegawa, T. Ito, Y. Kondo, T. Morishita
    JAEA/J-PARC, Tokai-mura, Japan
  • H. Iinuma, Y. Nakazawa
    Ibaraki University, Ibaraki, Japan
  • Y. Iwashita
    Kyoto ICR, Uji, Kyoto, Japan
  • R. Kitamura
    University of Tokyo, Tokyo, Japan
 
  Funding: This work was supported by JSPS KAKENHI Grant Numbers JP15H03666, JP 16H03987, JP18H03707.
A disk and washer (DAW) coupled cavity linac (CCL) has been developed for a middle velocity part in a muon linac at the J-PARC E34 experiment. It will accelerate muons from v/c = 0.3 to 0.7 at an operational frequency of 1296 MHz. In this poster, the cavity designs, beam dynamics designs, and the cold-model measurements will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPRB117  
About • paper received ※ 30 April 2019       paper accepted ※ 19 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRXXPLM3 Development of a Pulsed Power Supply Utilizing 13 kV Class SiC-MOSFET 4364
 
  • K. Okamura, F. Naito, K. Takayama
    KEK, Ibaraki, Japan
  • K. Fukuda, H. Kitai, K. Sakamoto
    AIST, Tsukuba, Ibaraki, Japan
  • T. Kaito
    Chiba Institute of Technology, Narashino, Chiba, Japan
  • D. Kumamoto
    Nagaoka University of Technology, Nagaoka, Niigata, Japan
  • S. Lim, A. Tokuchi
    Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
 
  Funding: A part of this work has been implemented under a joint research project of Tsukuba Power Electronics Constellation (TPEC).
To resolve the drawback of conventional thyratron switches, development of a semiconductor high voltage switch utilizing a 13 kV class SiC-MOSFET developed by Tsukuba Power Electronics Constellations (TPEC) is proceeding. At first, the device evaluation test was carried out with a resistive load circuit. With the conditions of drain voltage of 10 kV and load resistance of 1 kΩ, turn on loss Eon, turn off loss Eoff, rise time Tr and fall time Tf were 1.7 mJ, 1.1 mJ, 64 ns, and 75 ns, respectively. As to gate charge characteristics, required electric charge to increase gate source voltage from 0 V to 20 V was about 80 nC. Thereafter, the 2s-12p switch array was designed and assembled, where 12 MOSFETs are equally aligned on a circle shaped circuit board and two circuit boards are stacked in series. A 14 kV-490 A-5 us pulse with a rise time of 430 ns in the long pulse mode and a 18 kV-318 A-1 us pulse with a rise time of 289 ns in the short pulse mode were successfully demonstrated. This switch will be installed as a turn-off switch for the injec-tion ES kicker in the KEK-DA.
 
slides icon Slides FRXXPLM3 [5.088 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-FRXXPLM3  
About • paper received ※ 15 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)