Author: Mitsuda, C.
Paper Title Page
THPMP012 New Industrial Application Beamline for the cERL in KEK 3475
 
  • Y. Morikawa, K. Haga, M. Hagiwara, K. Harada, N. Higashi, T. Honda, Y. Honda, M. Hosumi, Y. Kamiya, R. Kato, H. Kawata, Y. Kobayashi, H. Matsumura, C. Mitsuda, T. Miura, T. Miyajima, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, H. Sagehashi, H. Sakai, M. Shimada, M. Tadano, R. Takai, H. Takaki, O.A. Tanaka, Y. Tanimoto, A. Toyoda, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
 
  The new beam line for the industrial applications is constructed at the cERL (compact Energy Recovery LINAC) in KEK. In these applications, only north straight sections of cERL consisting of injector and main LINAC will be used. The test for the radio isotope production and electron beam irradiation for the materials are firstly planned with very small beam current without energy recovery.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPMP012  
About • paper received ※ 11 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS027 Accelerator Implementing Development of Ceramics Chamber with Integrated Pulsed Magnet for Beam Test 4164
 
  • C. Mitsuda, Y. Kobayashi, S. Nagahashi, T. Nogami, T. Obina, R. Takai, H. Takaki, T. Uchiyama, A. Ueda
    KEK, Ibaraki, Japan
  • T. Honiden, T. Nakanishi
    SES, Hyogo-pref., Japan
  • A. Sasagawa, A. Yokoyama, T. Yokoyama
    KYOCERA Corporation, Higashiomi-city, Shiga, Japan
 
  We advance the development of Ceramics Chamber Integrated Pulsed Magnet (CCIPM) of air-core type as the application to low emittance ring with a narrow bore of light source accelerator in the future. The CCIPM is composed of ceramics cylinder of 60 mm diameter and four copper coils, which are implanted in the groove penetrated on the ceramic thickness along 30 cm length by silver brazing*. In addition to this structure, we succeeded in the implementations of cable connecting base that mechanically connect the coils and power supply with feeder lines and the pattern shape coating inside the ceramic cylinder. Improved brazing technique made it possible to braze the coil and the base on the coil at the same time that the coils are implanted in the ceramic thickness. Newly developed functional coating can reduce the eddy current caused by main magnetic field and pass the alternate component of beam wall current by capacitance structure. We report the details about the performance from the viewpoint of vacuum, magnetic field, insulation on the accelerator implementation with the approach to new technical development, and the preparation progress of beam test in beam-transport line.
* C. Mitsuda, et al., in Proc. IPAC2015, Richmond, VA, USA, p. 2879
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS027  
About • paper received ※ 12 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)