Author: Matsumoto, H.
Paper Title Page
TUPTS029 The New Eddy Current type Septum Magnets for Upgrading of Fast Extraction in Main Ring of J-PARC 1997
 
  • T. Shibata, K. Ishii, H. Matsumoto, T. Sugimoto
    KEK, Ibaraki, Japan
  • K. Fan
    HUST, Wuhan, People’s Republic of China
  • K. Hamano
    Nichicon (Kusatsu) Corporation, Shiga, Japan
 
  The J-PARC Main Ring (MR) is working on imporved beam to 750 kW by shorting the repetition period from 2.48 s to 1.3 s which we call 1Hz operation. The septum magnets for fast extraction in MR will be improved to the new septum magnets which can operate 1Hz. The new magnets will be installed to MR in 2021. In this poster we will report about the new low field septum magnet for the fast extraction. The present septum magnets are conventional type. Therefore, we have problem in durability of thin septum coil by its magnetic vibration, and large leakage field at the exit of the circulating beam duct. The new septum magnets are eddy current type. The eddy current type does not have septum coil, but has a thin septum plate. We can expect that there is no problem in durability of septum coil, and leakage field can be reduced. The output of the present power supply are pattern current which of flat top is 10 ms width, the new one is short pulse which of one is 10 us. The short pulse consists of fundamental and 3rd harmonic sin-wave pulse. We can expect that the flatness and reproducibility of flat top current can be improved. We confirmed that 1Hz operation and high accuracy of its output current and magnetic field with the new septum magnet system. We had some problem in unexpected instability of output current. In this report we also summarize the measure against the instabillity.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS029  
About • paper received ※ 26 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS030 The New High Field Septum Magnets for Upgrading of Fast Extraction in Main Ring of J-PARC 2001
 
  • T. Shibata, K. Ishii, H. Matsumoto, T. Sugimoto
    KEK, Ibaraki, Japan
  • K. Fan
    HUST, Wuhan, People’s Republic of China
 
  The J-PARC Main Ring (MR) is working on imporved beam to 750 kW by shorting the repetition period from 2.48 s to 1.3 s which we call 1Hz operation. There are fout high field septum magnet along the fast extraction line in the MR, and these will be improved to the new magnets which can operate 1Hz frequency. The new high field septa will be installed in 2021. In this poster we will report about the performance of these new septum magnets. These high field septum magnets are called Septum 30(SM30), 31(SM31), 32(SM32), 33(SM33). We will replace SM30, SM31, and SM32. One reasons of cethe replacement is installation of a large-size quadrupole magnet to upsteam postion of the septa. We need to change the longitudinal length of the septa. Second is large aperture of the beam duct for reduction of beam loss by the collision of the halo of the proton beam to the duct. The new high field SM30, SM31 and SM32 have large aperture. and the material of the beam ducts for extraction line are ceramics for reduction of amount of heat generation by eddy current on the surface of the duct. The maetial of the circulating duct are titanium for reduction of radioactivation. On the other hand, the power supply will not be replaced, then the current power supplies will be used for these new septa. The new SM30, SM31, and SM32 were produced in 2015. The first test operation of SM31 were conduced with 2.48 s repein 2015, and we have meaured the magnetic field without problem. In 2018, we conduced the first 1Hz operation with SM30. The minimum repetition period of the operation was 1.16 s without any problem. We measuered magnetic fields in the gap of the pole and in the circulating beam duct. In this report we will report the detail of the results of the operation and field measurement.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS030  
About • paper received ※ 26 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)