RFQ Electrodes Change and Upgrade Option at the UNILAC HSI Injector |
936 |
|
- M. Vossberg, P. Gerhard, L. Groening, S. Mickat, H. Vormann, C. Xiao
GSI, Darmstadt, Germany
- V. Bencini, J.M. Garland, J.-B. Lallement, A.M. Lombardi
CERN, Meyrin, Switzerland
|
|
|
In order to meet the beam intensity and quality requirements imposed by FAIR, the HSI-RFQ beam dynamics originally dating from 2009 has been re-designed recently at CERN. Front-to-end simulations demonstrated that the new design meets the FAIR targets. Implementation of the new electrodes, initially planned for 2019, will require re-adaption of the RFQ cavity rf-parameters by re-shaping the stems that keep the electrodes. However, during the beam time 2018 the existing RFQ did not reach its nominal voltage most likely due to expired lifetime of the electrodes originating from 2009. In order to shorten the RFQ maintenance period and to minimize any risk for upcoming beam time 2019, it was decided to post-pone the implementation of the new design and rather just re-producing the 2009 design electrodes. This contribution is on the re-production process as short-term solution and on the full implementation of the new design as mid-term solution. CST simulations performed at GSI assure that the resonance frequency with the new electrode geometry is recuperated through corrections of the carrier rings. The status of the exchange of the electrodes and simulations for the adaptation of the new electrode design are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS036
|
|
About • |
paper received ※ 13 May 2019 paper accepted ※ 17 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS096 |
Linac4: Reliability Run Results and Source Extraction Studies |
1090 |
|
- D. Noll, G. Bellodi, S.B. Bertolo, F.D.L. Di Lorenzo, J.-B. Lallement, J. Lettry, A.M. Lombardi, C.M. Mastrostefano, B. Mikulec, M. O’Neil, S. Schuh, R. Wegner
CERN, Geneva, Switzerland
|
|
|
Linac4, a 160 MeV, 352.2 MHz linear accelerator, has been fully commissioned and will take its place as new injector to the CERN chain of accelerators during the long shutdown (LS2) in 2019-2020. In the past year, it has been continuously providing beam during a test run to assess its reliability in view of the connection to the LHC injector chain. The target reliability of more than 90% has been demonstrated during the accumulated nine months of run in 2017 and 2018. The beam quality at 160 MeV is suitable for producing all beams for the CERN physics program of today. Nevertheless, the limited peak current of 30mA might be a limitation for future high intensity programs. The bottleneck has been identified at the low energy end of the accelerator. In the meantime, beam extraction and low energy beam transport studies are ongoing at a dedicated test stand with the goal to reach beam currents from the pre-injector up to 45 mA. We will present the status of the modelling of the pre-injector and possible solutions to reach higher beam currents from the RFQ along with results from the reliability run.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS096
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 19 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THXPLM1 |
LHC Injectors Upgrade Project: Towards New Territory Beam Parameters |
3385 |
|
- M. Meddahi, R. Alemany-Fernández, H. Bartosik, G. Bellodi, J. Coupard, H. Damerau, G.P. Di Giovanni, F.B. Dos Santos Pedrosa, A. Funken, B. Goddard, K. Hanke, A. Huschauer, V. Kain, A.M. Lombardi, B. Mikulec, S. Prodon, G. Rumolo, R. Scrivens, E.N. Shaposhnikova
CERN, Geneva, Switzerland
|
|
|
The LHC injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC injectors in order to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring high availability and reliable operation of the injectors complex up to the end of the HL-LHC era (ca. 2035). This requires extensive hardware modifications and new beam dynamics solutions in the entire LHC proton and ion injection chains: the new Linac4, the Proton Synchrotron Booster, the Proton Synchrotron the Super Proton Synchrotron together with the ion PS injectors (the Linac3 and the Low Energy Ion Ring). All hardware modifications will be implemented during the 2019-2020 CERN accelerators shutdown. This talk would analyze the various project phases, share the lessons learned, and conclude on the expected beam parameter reach, together with the related risks.
|
|
|
Slides THXPLM1 [20.029 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THXPLM1
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|