Paper | Title | Page |
---|---|---|
MOZZPLS2 | Positron Driven Muon Source for a Muon Collider: Recent Developments | 49 |
|
||
The design of a future multi-TeV muon collider needs new ideas to overcome the technological challenges related to muon production, cooling, accumulation and acceleration. The Low Emittance Muon Accelerator (LEMMA) concept *,** presents in this paper an upgraded layout of a positron driven muon source. The positron beam, stored in a ring with high energy acceptance and low emittance, is extracted and driven in a push-pull configuration to a multi-target system, to produce muon pairs at threshold on the target’s electrons. This solution alleviates the issues related to the power deposited and the integrated Peak Energy Density Deposition on the targets. Muons produced in the multi-target system will then be accumulated in many parallel rings before acceleration and injection in the collider. A special multi-target line lattice has been designed to cope with the focusing of both the positron and muon beams. Studies on the number, material and thickness of the targets have been carried out. A general layout of the overall scheme and a description is presented, as well as plans for future R&D.
* M. Antonelli, P. Raimondi, INFN-13-22/LNF, 2013 ** M. Boscolo, M. Antonelli, O.R. Blanco-Garcia, S. Guiducci, S. Liuzzo, P. Raimondi, F. Collamati, Phys. Rev. Accel. Beams, vol. 21, p. 061005, 2018 |
||
![]() |
Slides MOZZPLS2 [4.360 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOZZPLS2 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPGW005 | Preparation of the EBS Beam Commissioning | 1388 |
|
||
In 2020 the ESRF storage ring will be upgraded to a Hybrid Multi Bend Achromat (HMBA) lattice. The commissioning of the new ring will require dedicated tools, either updated from the existing ones or newly developed. Most of the software and procedures were tested on the existing storage ring before its decommissioning. In particular we present experiments on first-turn steering and beam accumulation, check of magnet polarity and calibration, and injection tuning. The use of a control-system simulator proved to be crucial for the debugging of the software and the development of the new control system, as far as beam measurements and manipulations are concerned. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW005 | |
About • | paper received ※ 26 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |