Paper |
Title |
Page |
MOPRB028 |
Application of WCM in Beam Commissioning of RCS in CSNS |
636 |
|
- M.T. Li, F. Li
IHEP CSNS, Guangdong Province, People’s Republic of China
- Y.W. An, S.Y. Xu, T.G. Xu
IHEP, Beijing, People’s Republic of China
|
|
|
Wall Current Monitor (WCM) is the only beam instru-ment in RCS of CSNS. It is utilized to derive many kinds of physics parameters during beam commissioning. The longitudinal phase distribution of the bunch over the boosting time is deduced for our future analyzation.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB028
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|