Paper |
Title |
Page |
MOPTS001 |
Operational Experience with a Sled and Multibunch Injection at the Australian Synchrotron |
830 |
|
- M.P. Atkinson, G. LeBlanc
AS - ANSTO, Clayton, Australia
- K. Zingre
ASCo, Clayton, Victoria, Australia
|
|
|
The Australian third generation 3 GeV Synchrotron Light Source was originally commissioned with a 100 MeV linear accelerator (LINAC) fed by two 37 MW S band pulsed klystrons. A pulse compressor in form of a SLED cavity was added later to enable single klystron operation for redundancy in case of a modulator failure. The SLED was successfully commissioned in May 2017 including remote selection of single klystron with SLED operation without degradation of beam energy. Two years on there have been some unexpected operational benefits including reduced phase sensitivity and drift allowing repeatable injection based solely on diagnostic phase read backs. Temperature stabilised power amplifiers based on S band GaN radar technology are being trialed in the meantime with a goal to set and inject with minimal operator adjustment. The results from the SLED cavity upgrade are shown and the latest S band radar technology designs are outlined.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS001
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|