Paper |
Title |
Page |
MOPRB062 |
nuSTORM Decay Ring |
716 |
|
- J.-B. Lagrange
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
- R.B. Appleby, S.C. Tygier
UMAN, Manchester, United Kingdom
- J. Pasternak
STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
- J. Pasternak
Imperial College of Science and Technology, Department of Physics, London, United Kingdom
|
|
|
Precise neutrino cross section measurements and search for sterile neutrinos can be done with neutrino beams produced from muons decaying in a storage ring due to its precisely known flavour content and spectrum. In the proposed nuSTORM facility pions would be directly injected into a racetrack storage ring, where circulating muon beam would be captured. The storage ring has three options: a FODO solution with large aperture quadrupoles, a racetrack FFA (Fixed Field Alternating gradient) using the recent developments in FFAs and a hybrid solution of the two previous options. Machine parameters, linear optics design and beam dynamics of the hybrid solution are discussed in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB062
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPRB063 |
Longitudinal Tomography in a Scaling FFA |
719 |
|
- D.J. Kelliher, C. Brown, J.-B. Lagrange, S. Machida, C.R. Prior, C.T. Rogers
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
- Y. Ishi, Y. Kuriyama, H. Okita, T. Uesugi
Kyoto University, Research Reactor Institute, Osaka, Japan
- S.L. Sheehy
JAI, Oxford, United Kingdom
|
|
|
In a synchrotron the rate of acceleration is limited by the ramp rate of the bending field. There is no such constraint in a Fixed Field alternating gradient Accelerator (FFA), allowing a much higher repetition rate and novel modes of operation such as beam stacking. It is of interest to obtain a picture of the longitudinal phase space from experimental data in order to diagnose the response of the beam to various RF programmes. Longitudinal tomography, already well established in synchrotrons, involves reconstructing the phase space using bunch monitor data obtained for a sufficient number of turns in a synchrotron oscillation. Here we reconstruct the longitudinal phase space using data from the 150 MeV scaling FFA at KURNS, Osaka, Japan.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB063
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPTS068 |
Progress on Design Studies for the ISIS II Upgrade |
2075 |
|
- J.-B. Lagrange, D.J. Adams, C. Brown, H.V. Cavanagh, I.S.K. Gardner, P.T. Griffin-Hicks, B. Jones, D.J. Kelliher, A.P. Letchford, S. Machida, B.G. Pine, C.R. Prior, C.T. Rogers, J.W.G. Thomason, C.M. Warsop, R.E. Williamson
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
- J. Pasternak, J.K. Pozimski
STFC/RAL, Chilton, Didcot, Oxon, United Kingdom
- J. Pasternak, J.K. Pozimski
Imperial College of Science and Technology, Department of Physics, London, United Kingdom
- G.H. Rees
STFC/RAL/ASTeC, Chilton, Didcot, Oxon, United Kingdom
|
|
|
ISIS, the spallation neutron source at the Rutherford Appleton Laboratory in the UK, uses a 50 Hz, 800 MeV proton RCS to provide a beam power of 0.2 MW, delivered in 0.4 us long pulses. Detailed studies are now under way for a major upgrade. Accelerator designs using FFAs, conventional accumulator and synchrotron rings are being considered for the required MW beam power. This paper summarises the scope of the different research incorporating results from recent target studies and user consultations. Preliminary results for Fixed Field Alternating gradient (FFA) rings and conventional rings located in the existing ISIS synchrotron hall are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS068
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|