Author: Kümpel, K.
Paper Title Page
MOPTS022 Current Status of the MYRRHA Cavities 892
SUSPFO019   use link to see paper's listing under its alternate paper code  
 
  • K. Kümpel, D. Bade, M. Busch, D. Koser, S. Lamprecht, N.F. Petry, H. Podlech, S. Zimmermann
    IAP, Frankfurt am Main, Germany
 
  The MYRRHA (Multi-purpose hYbrid Research Reac-tor for High-tech Applications) Project is a planned ac-celerator driven system (ADS) for the transmutation of long-living radioactive waste. In order test the reliability of the planned 17 MeV injector, a shortened injector with 5.9 MeV consisting of the ion source, a 4-Rod RFQ, 2 Quarter Wave Rebunchers (QWRs) and a total of 7 normal conducting CH structures is currently being installed in Louvein-la-Neuve (LLN, Belgium). Before the cavities can be tested with beam, they are subjected to so-called low power tests several times during the individual con-struction stages in order to be able to correct any devia-tions. This paper describes the status of the two Quarter Wave Rebunchers, which are currently in the process of copper plating and final acceptance, as well as the first two CH structures, the first of which is already being conditioned while CH 2 is still in preparation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS022  
About • paper received ※ 10 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS023 Conditioning of the Frontline Cavities of the MYRRHA Injector 895
SUSPFO020   use link to see paper's listing under its alternate paper code  
 
  • S. Lamprecht, T. Conrad, K. Kümpel, N.F. Petry, H. Podlech
    IAP, Frankfurt am Main, Germany
  • J. Belmans, D. Davin, W. De Cock, F. Pompon, D. Vandeplassche
    SCK•CEN, Mol, Belgium
 
  The MYRRHA Project (Multi-purpose hYbrid Research Reactor for High-tech Applications) in Mol, Belgium, is an upcoming accelerator driven system (ADS) for the transmutation of long-living radioactive waste. In the injector section of the accelerator, consisting of a 4-rod RFQ and a normal conducting CH-cavity section, the protons will be accelerated up to 17 MeV before entering the superconducting gap-spoke cavity section with an output energy of 600 MeV. A shortened test-injector with an output energy of 5.9 MeV is currently being installed at the SCK. CEN in Louvein-la- Neuve, Belgium. This test-injector serves the purpose of testing the reliability of the planned injector. When commissioning a cavity, it first has to be fed very little power to avoid damage to the structure by flashovers, discharges and multipacting. The power is then slowly increased up to full operation level. In this process, the surfaces are cleaned by heating/outgasing so that the effects disturbing operation described above do no longer occur. This paper will report on the status of the conditioning of the 176.1 MHz 4-rod RFQ up to 120 kW of the MYRRHA-injector and additional measurements concerning the gap voltage which are currently being performed at the SCK. CEN.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS023  
About • paper received ※ 13 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS027 Conceptual Design of the Proton LINAC for the High Brilliance Neutron Source HBS 910
 
  • H. Podlech, M. Droba, K. Kümpel, S. Lamprecht, O. Meusel, N.F. Petry, P.P. Schneider, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • J. Baggemann, Th. Brückel, T. Cronert, P.-E. Doege, T. Gutberlet, E. Mauerhofer, U. Rücker, P. Zakalek
    JCNS, Jülich, Germany
  • S. Böhm
    NET, Aachen, Germany
  • J. Li
    IEK, Jülich, Germany
  • C. Zhang
    GSI, Darmstadt, Germany
 
  Due to the decommissioning of several research reactors there will be a severe drop in available neutrons for research in Europe in the next decade despite the commissioning of the European Spallation Source (ESS). Compact accelerator-based neutron sources (CANS) could close this gap. The High Brilliance Neutron Source (HBS) currently under development at Forschungszentrum Jülich is scalable in terms of beam energy and power due to its modular design. The driver Linac for HBS at will accelerate a 100 mA proton beam to 70 MeV. The Linac is operated with a beam duty cycle of up to 6% (11% RF duty cycle) and can simultaneously deliver three proton pulse lengths (384 Hz@52 mu-s, 96 Hz@208 mu-s and 24 Hz@832 mu-s) for three neutron production targets. In order to minimize the development effort and the technological risk, state-of-the-art technology of the MYRRHA injector is used. The front end of the HBS Linac consists of an ECR source, LEBT and a 2.5 MeV RFQ followed by a CH-DTL with 35 room temperature CH-cavities. All RF structures are operated at 176.1 MHz and are designed for high duty cycle. Solid-state amplifiers up to 500 kW are used as RF drivers. Due to the beam current and the high average beam power of up to 420 kW, particular attention is paid to beam dynamics. In order to minimize losses, a quasi-periodic lattice with constant negative phase is used. The contribution describes the conceptual design and the challenges of such a modern high power proton accelerator with high reliability and availability.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS027  
About • paper received ※ 07 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS013 Further Designs of HOM Couplers for Superconducting 400 MHz RF Cavities 4132
SUSPFO022   use link to see paper's listing under its alternate paper code  
 
  • N.F. Petry, M. Busch, K. Kümpel, O. Meusel, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  The Future Circular Collider (FCC) is one possible future successor of the Large Hadron Collider (LHC) at CERN. The proton-proton collider center-of-mass collision energy is set to 100 TeV with a beam current of 0.5 A. To achieve this energy a stable acceleration is critical and therefore higher order modes (HOM) need to be damped. HOM dampers, further characterized as couplers, need to fulfill several criteria to be efficient. As a first property the couplers should assure a longitudinal impedance of higher order modes of below 10 kW. Furthermore, the loaded Q-factor should be below 1000 and the corresponding R/Q value should be in the range of 10 Ω. Besides the Hook-type and Probe-type HOM coupler two additional designs were simulated. The recent results of the different couplers attached to a superconducting 400 MHz RF cavity will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS013  
About • paper received ※ 09 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)