Paper |
Title |
Page |
WEPGW085 |
Development of Operating Alarm System at TPS |
2684 |
|
- C.S. Huang, B.Y. Chen, C.K. Kuan, C.H. Kuo, T.Y. Lee, W.Y. Lin, S.Y. Perng, T.C. Tseng, H.S. Wang
NSRRC, Hsinchu, Taiwan
|
|
|
The Taiwan Photon Source (TPS) has many subsystems which includes magnet, power supply, vacuum, RF system, insertion device, control system, etc. Therefore, the operational and system check procedures are complex. In this paper, we summarize the routine operational procedures and propose an integrated operational alarm system that gathers machine information and sets high/low warning and fault limits for various signals which can help operators to quickly identify abnormal subsystems, thereby reducing machinery down time. The alarm system also has a wide range of applications, such as the event recording that helps the analysis after event. This new alarm system interface clearly indicates the machine status and improves operational efficiency.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW085
|
|
About • |
paper received ※ 15 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPGW087 |
Control System Studio to Monitor Front End and Beamlines Status as well as Light Source Stability |
2687 |
|
- W.Y. Lin, B.Y. Chen, C.S. Huang, C.H. Kuo, T.Y. Lee
NSRRC, Hsinchu, Taiwan
|
|
|
The primary task during a shift change at the Taiwan Photon Source Accelerator Operations team is to know the exact status of the machine, so that problems can be discovered immediately and solved when the machine behaves abnormal. To provide a stable beam during top-up operation, it is necessary to monitor closely the stability of the light source, of front end areas and beamlines. Should any abnormality occur, the operator would initiate initial troubleshooting and adjustments, inform users and sub-system staff members and perform subsequent first anal-yses and system optimizations. In this article, we describe how to sort through the nec-essary information with the Control System Studio (CSS) design page. There are currently seven beamlines in operation at the Taiwan Photon Source (05, 09, 21, 23, 25, 41, 45) and more new beamlines will be added in the future. Com-pared with other tools, CSS is intuitive and easy to revise. No matter weather adding new parameters or changing settings, the operation team can quickly get familiar with the machine status and perform an interface upgrade.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW087
|
|
About • |
paper received ※ 27 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THYYPLS3 |
A Remote-Controlled Robot-Car in the TPS Tunnel |
3435 |
|
- T.Y. Lee, B.Y. Chen, T.W. Hsu, B.Y. Huang, C.H. Kuo, W.Y. Lin
NSRRC, Hsinchu, Taiwan
|
|
|
A remote-controlled robot-car named ’PhotonBot’ was put into the TPS accelerator tunnel and is equipped with a 360 degrees LiDAR for SLAM and navigation, two cameras for perception and first-person view, and a thermal imaging system. The robot can be remotely controlled and can send data to a remote PC through Wi-Fi. With SLAM, it can go more freely without being restricted to a designated path. In order to ensure it can work continuously, there is a wireless charging station in case of a low battery.
|
|
|
Slides THYYPLS3 [18.013 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THYYPLS3
|
|
About • |
paper received ※ 09 April 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRB091 |
APPLICATION PROGRAMS FOR TPS BEAM TRIP ANALYSIS |
4032 |
|
- B.Y. Chen, T.W. Hsu, B.Y. Huang, C.S. Huang, C.H. Kuo, T.Y. Lee, W.Y. Lin
NSRRC, Hsinchu, Taiwan
|
|
|
For the Taiwan Photon Source (TPS), the orbit inter-lock system is one of the most important machine pro-tection systems. It is the fastest and the most preferred system to detect abnormalities to prevent possible dam-ages caused by magnet power supply failures or subsys-tems failures. In order to monitor electron orbit changes during a beam trip, we developed the ’orbit monitoring and recording tool’, the ’TBT BPM analysis tool’ and the ’magnet power supply recording and analysis tool’ to assist us in the failure analysis as will be discussed in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB091
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|