Author: Kube, G.
Paper Title Page
MOPTS025 Overview of the ARES Bunch Compressor at SINBAD 902
 
  • F. Lemery
    University of Hamburg, Hamburg, Germany
  • R.W. Aßmann, U. Dorda, K. Flöttmann, J. Hauser, M. Hüning, G. Kube, M. Lantschner, S. Lederer, B. Marchetti, N. Mildner, M. Pelzer, M. Rosan, J. Tiessen, K. Wittenburg
    DESY, Hamburg, Germany
 
  Funding: This project has received funding from the European Unions Horizon 2020 Research and Innovation programme under Grant Agreement No 730871.
Bunch compressors are essential for the generation of short bunches with applications in e.g. colliders, free electron lasers, and advanced accelerator concepts. The up-and-coming ARES accelerator located at SINBAD, DESY will support the formation of ~100~MeV, pC, sub-fs electron bunches for LWFA research and development. We give an overview on the ARES bunch compressor, providing start-to-end simulations of the machine and an update on its technical design.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS025  
About • paper received ※ 17 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPGW011 Status of the PETRA IV project 1404
 
  • I.V. Agapov, R. Bacher, M. Bieler, R. Bospflug, R. Brinkmann, Y.-C. Chae, H.C. Chao, H.T. Duhme, M. Ebert, H.-J. Eckoldt, H. Ehrlichmann, X.N. Gavaldà, M. Hüning, U. Hurdelbrink, J. Keil, J. Klute, M. Körfer, B. Krause, G. Kube, W. Leemans, L. Lilje, F. Obier, A. Petrov, N. Plambeck, J. Prenting, G.K. Sahoo, H. Schlarb, M. Schlösser, F. Schmidt-Föhre, M. Schmitz, C.G. Schroer, T. Tempel, M. Thede, M. Tischer, R. Wanzenberg, E.F. Weckert, T. Wilksen, K. Wittenburg, J.X. Zhang
    DESY, Hamburg, Germany
 
  Since 2016 DESY has been pursuing R&D towards upgrading its PETRA synchrotron light source to a fourth-generation machine, PETRA IV, which is expected to start operation in 2027. The conceptual design of a 6 GeV seven-bend-achromat-based lattice with an approx. 10pm emittance along with critically important technical systems has been completed. We will present the status of the project, the expected parameter space of the facility, and lattice design and beam dynamics issues for the main ring.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW011  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)