Paper |
Title |
Page |
MOPTS022 |
Current Status of the MYRRHA Cavities |
892 |
SUSPFO019 |
|
|
- K. Kümpel, D. Bade, M. Busch, D. Koser, S. Lamprecht, N.F. Petry, H. Podlech, S. Zimmermann
IAP, Frankfurt am Main, Germany
|
|
|
The MYRRHA (Multi-purpose hYbrid Research Reac-tor for High-tech Applications) Project is a planned ac-celerator driven system (ADS) for the transmutation of long-living radioactive waste. In order test the reliability of the planned 17 MeV injector, a shortened injector with 5.9 MeV consisting of the ion source, a 4-Rod RFQ, 2 Quarter Wave Rebunchers (QWRs) and a total of 7 normal conducting CH structures is currently being installed in Louvein-la-Neuve (LLN, Belgium). Before the cavities can be tested with beam, they are subjected to so-called low power tests several times during the individual con-struction stages in order to be able to correct any devia-tions. This paper describes the status of the two Quarter Wave Rebunchers, which are currently in the process of copper plating and final acceptance, as well as the first two CH structures, the first of which is already being conditioned while CH 2 is still in preparation.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS022
|
|
About • |
paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|