Author: Koser, D.
Paper Title Page
MOPTS022 Current Status of the MYRRHA Cavities 892
SUSPFO019   use link to see paper's listing under its alternate paper code  
 
  • K. Kümpel, D. Bade, M. Busch, D. Koser, S. Lamprecht, N.F. Petry, H. Podlech, S. Zimmermann
    IAP, Frankfurt am Main, Germany
 
  The MYRRHA (Multi-purpose hYbrid Research Reac-tor for High-tech Applications) Project is a planned ac-celerator driven system (ADS) for the transmutation of long-living radioactive waste. In order test the reliability of the planned 17 MeV injector, a shortened injector with 5.9 MeV consisting of the ion source, a 4-Rod RFQ, 2 Quarter Wave Rebunchers (QWRs) and a total of 7 normal conducting CH structures is currently being installed in Louvein-la-Neuve (LLN, Belgium). Before the cavities can be tested with beam, they are subjected to so-called low power tests several times during the individual con-struction stages in order to be able to correct any devia-tions. This paper describes the status of the two Quarter Wave Rebunchers, which are currently in the process of copper plating and final acceptance, as well as the first two CH structures, the first of which is already being conditioned while CH 2 is still in preparation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS022  
About • paper received ※ 10 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)