Paper | Title | Page |
---|---|---|
MOPTS077 | RCCS Operation and Characteristics in Resonance Frequency Control Mode at KOMAC | 1025 |
|
||
Funding: This work has been supported through KOMAC (Korea Multi-purpose Accelerator Complex) operation fund of KAERI by MSIT (Ministry of Science and ICT) A 100-MeV proton accelerator is under operation at Korea Multi-purpose Accelerator Complex (KOMAC). The resonance control cooling system (RCCS) has supplied the cooling water to drift tube linac (DTL). The DTL need to keep the resonant frequency of 350MHz during the operation. RCCS has a critical role in sustaining the acceptable resonant frequency error in DTL by adopting the resonance frequency control mode. Details on the RCCS operation in resonance frequency control mode will be given in this study. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS077 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPGW049 | Fabrication of On-Line Test Facility of Li-8 Beam at KOMAC | 3697 |
|
||
Funding: This work has been supported through KOMAC operation fund of KAERI by MSIT and the NRF of Korea grant funded by the Korea government (MSIT) (No. NRF-2017M2A2A6A02071070). A Li-8 beam facility has been developed at KOMAC. A target/ion source (TIS) was fabricated, and heating experiment of a target heater and a surface ion source was conducted at off-line test site. Also, beam optics components were developed. They are utilized in Li-8 beam line that electrostatic steerers to adjust misalignment of the beam, Einzel lens to focus beam and Wien filter to separate Li-8. Furthermore, a high-energy beta-ray telescope detector was developed as a dedicated beta-decay spectrometer for diagnostics of the Li-8 beam. The TIS, the beam optics and the beam diagnostics are installed in a target room (TR104) of the 100-MeV proton linac. An experiment of the proton beam transportation into TR104 and the TIS heating experiment were conducted separately. Finally, the on-line test of TIS has been conducted to generate Li-8 beam and examine the beam optics and the diagnostics. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW049 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |