Paper | Title | Page |
---|---|---|
TUPMP036 | Results on the FCC-hh Beam Screen Sawtooth at the Kit Electron Storage Ring Kararesults on the Fcc-Hh Beam Screen Sawtooth at the Kit Electron Storage Ring Kara | 1323 |
|
||
Funding: * The European Circular Energy-Frontier Collider Study (EuroCirCol) project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant No 654305. In the framework of the EuroCirCol collaboration (work package 4 "Cryogenic Beam Vacuum System"), the fabrication of the FCC-hh beam screen (BS) prototype has been carried out with the aim of testing it at room temperature on the Karlsruhe Institute of Technology (KIT) 2.5 GeV electron storage ring KARA (KArlsruhe Research Accelerator) light source. The BS prototype was tested on a beamline installed by the collaboration, named as BEam Screen TEstbench EXperiment (BESTEX). KARA has been chosen because its synchrotron radiation (SR) spectrum, photon flux and power match quite well the one foreseen for the 50+50 TeV FCC-hh proton collider. The BS prototype (2 m in length) was manufactured according to the base line design (BD) of the FCC-hh BS. It implements a saw-tooth profile designed to absorb the SR generated at the bending magnets. Also, a laser-ablated anti-electron cloud surface texturing [2] was applied at the BS inner walls. We present here the results obtained at BESTEX and the comparison of the results obtained during irradiation of the saw-tooth profile at different geometric configurations. This activity has been carried out in the framework of the EuroCirCol* collaboration (work package 4 "Cryogenic Beam Vacuum System"). |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP036 | |
About • | paper received ※ 13 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPGW016 | New Operation Regimes at the Storage Ring KARA at KIT | 1422 |
|
||
The storage ring Karlsruhe Research Accelerator (KARA) at KIT operates in a wide energy range from 0.5 to 2.5 GeV. Initially, the ring was designed to serve as a Light Source for synchrotron radiation facility ANKA. Since then different operation modes have been implemented at KARA: in particular, the double bend achromat (DBA) lattice with non-dispersive straight sections, the theoretical minimum emittance (TME) lattice with distributed dispersion, and different versions of low compaction factor optics with highly stretched dispersion function. Short bunches of a few ps pulse width are available at KARA. Low alpha optics have been tested and implemented in a wide operational range of the ring and are now routinely used at 1.3 GeV for studies of CSR-induced beam dynamics and THz bursting in the micro-bunching instability. Different non-linear effects, in particular, residual high order components of magnetic fields generated in insertion devices have been studied and cured. A new operation mode at high vertical tune implemented at KARA essentially improves beam performance during user operation as well as at low alpha regimes. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW016 | |
About • | paper received ※ 23 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPTS016 | Longitudinal Beam Manipulation by RF Phase Modulation at the Karlsruhe Research Accelerator | 3123 |
|
||
At the storage ring KARA (Karlsruhe Research Accelerator) of the Karlsruhe Institute of Technology (KIT) we have installed a function for the RF phase modulation to the low-level RF system. By choosing proper conditions of the modulation, the electron distribution on the longitudinal phase space can be changed in a large range. There are several applications of this longitudinal manipulation to the accelerator operation: an improvement of the beam lifetime and suppression of collective instabilities. We have performed tracking simulations for the longitudinal beam manipulation by the RF phase modulation. The results have implied that the longitudinal phase space distribution strongly depends on the modulation frequency. We have also performed experiments, which aimed at improving the beam lifetime in 2.5 GeV KARA multi-bunch operations. In this contribution, the low-level RF system at KARA, the simulation and experimental results under the RF phase modulation will be presented. As one of the options of the modulation, we consider manipulation of the internal fine structure in the longitudinal phase space by the modulation. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS016 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |