Paper |
Title |
Page |
MOPTS087 |
Transverse Emittance Studies at Extraction of the CERN PS Booster |
1058 |
|
- F. Antoniou, S.C.P. Albright, F. Asvesta, H. Bartosik, G.P. Di Giovanni, V. Forte, M.A. Fraser, A. Garcia-Tabares, A. Huschauer, B. Mikulec, T. Prebibaj, A. Santamaría García, P.K. Skowroński
CERN, Meyrin, Switzerland
- F. Asvesta
NTUA, Athens, Greece
- T. Prebibaj
National Technical University of Athens, Zografou, Greece
|
|
|
Transverse emittance discrepancy in the beam transfer between the Proton Synchrotron Booster (PSB) and the Proton Synchrotron (PS) is observed in operational conditions for the LHC beams at CERN. The ongoing LHC Injectors Upgrade (LIU) project requires a tight budget for beam degradation along the injector chain and therefore the reason for this emittance discrepancy needs to be understood. Systematic measurements have been performed for various beam characteristics (beam intensity, transverse and longitudinal emittance). In this paper, a comparison between the emittance measurements using all available beam instrumentation with different emittance computation algorithms is presented. The results are compared to measurements at PS injection. Furthermore, the impact on the LIU project requirements for the emittance preservation along the LHC Injectors Complex is discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS087
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS100 |
Transverse Emittance Measurement in the CERN Proton Synchrotron in View of Beam Production for the High-Luminosity LHC |
1106 |
SUSPFO107 |
|
|
- E. Senes, J. Emery, V. Forte, M.A. Fraser, A. Guerrero, A. Huschauer, F. Roncarolo, J.L. Sirvent, P.K. Skowroński, F. Tecker
CERN, Meyrin, Switzerland
|
|
|
In the framework of the LHC Injectors Upgrade project the improvements required to achieve the parameters of the future beams for the High-Luminosity LHC are being studied and implemented. In order to deliver high brightness beams, control over the beam intensity and emittance is fundamental. Therefore, a highly accurate and reliable transverse emittance measurement is essential. Presently at the CERN Proton Synchrotron, the only operationally available emittance monitors not impacting the facility beam production are the flying wire scanners used to measure the circulating beam profile. The wire scanners will be replaced with a new generation in the next two years and a prototype is already installed. The prototype has been commissioned with beams featuring a wide range of intensities and emittances. This paper evaluates the performance of the prototype with respect to the present system via beam-based measurements. The transverse emittance measurement is discussed, considering the different potential error contributions to the measurement, such as knowledge of the machine optics and the dispersive contribution to the beam size.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS100
|
|
About • |
paper received ※ 02 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS102 |
Linear and Non-Linear Optics Measurements in PS using Turn-by-Turn BPM Data |
1114 |
|
- P.K. Skowroński, M. Giovannozzi, A. Huschauer
CERN, Geneva, Switzerland
|
|
|
For the first time, the optics of the CERN Proton Synchrotron (PS) was measured using turn-by-turn BPM data of forced betatron oscillations excited with an AC dipole. We report results of phase advance and beta beating measurements. Linear coupling was globally minimized along the machine by measuring and correcting coupling resonance driving terms. Finally, non-linear properties of the ring were probed looking at third and fourth order resonance driving terms and amplitude detuning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS102
|
|
About • |
paper received ※ 07 May 2019 paper accepted ※ 19 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS107 |
Beam Manipulations With Barrier Buckets in the CERN PS |
1132 |
SUSPFO120 |
|
|
- M. Vadai, A. Alomainy
QMUL, London, United Kingdom
- H. Damerau, S.S. Gilardoni, M. Giovannozzi, A. Huschauer
CERN, Geneva, Switzerland
|
|
|
A barrier bucket scheme is being considered to reduce losses during the Multi-Turn Extraction from the CERN Proton Synchrotron to the Super Proton Synchrotron for the fixed-target physics programme. For effective loss reduction, the extraction kicker has to be triggered during the gap at the time of the longitudinal barrier. Initial beam studies at injection energy and with low intensity beams allowed to fully qualify an existing wide-band cavity to generate one or multiple beam synchronous pulses per turn. Bunch-length stretching and shortening have been exercised with barriers moving in azimuth with respect to the beam. The encouraging results obtained at injection energy guided the implementation of a de-bunching manipulation at higher energy to move all bunches into a single barrier bucket. Beam measurements at a momentum of 14GeV/c, varying intensity and the width of the barrier, demonstrate that a quasi-constant longitudinal line density and an almost fully depleted gap can be achieved at highest intensities. The contribution summarises the results of the beam studies at high energy together with some observations related to the Multi-Turn Extraction.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS107
|
|
About • |
paper received ※ 18 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMP025 |
Matching Studies Between CERN PSB and PS Through Multi-Turn Beam Profile Acquisitions |
2367 |
|
- M.A. Fraser, Y. Dutheil, V. Forte, A. Guerrero, A. Huschauer, A. Oeftiger, S. Ogur, F. Roncarolo, E. Senes, F. Tecker
CERN, Geneva, Switzerland
|
|
|
In the framework of the LHC Injectors Upgrade (LIU) project, the investigation and quantification of the optics mismatch between the CERN Proton Synchrotron Booster (PSB) and PS is a crucial step in understanding the source of horizontal emittance growth between the two machines. Extensive studies were carried out to estimate the mismatch from single-pass measurements in the transfer line and to rematch the transfer line to reduce the dispersive mismatch at PS injection while keeping the betatron matching unaltered. This paper presents the results of the data analysis of more recent multi-turn measurements, which profited from a new turn-by-turn beam profile monitor in the PS ring, to assess the achieved level of matching and corresponding emittance growth. The results confirm the improved matching and demonstrate the feasibility of the multi-turn technique as a fundamental tool that will be important for the recommissioning of the renovated transfer line after Long Shutdown 2.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP025
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMP026 |
Emittance Dilution from the CERN Proton Synchrotron Booster’s Extraction Kickers |
2371 |
|
- M.A. Fraser, S.C.P. Albright, F. Antoniou, G.P. Di Giovanni, Y. Dutheil, V. Forte, A. Huschauer, F. Roncarolo
CERN, Meyrin, Switzerland
|
|
|
Understanding the different sources of emittance dilution along the LHC injector chain is an important part of providing the high brightness proton beams demanded by the LHC Injectors Upgrade (LIU) project. In this context, the first beam-based measurements of the magnetic waveforms of the Proton Synchrotron Booster’s (PSB) extraction kickers were carried out and used to quantify the transverse emittance blow-up during extraction and transfer to the Proton Synchrotron (PS). In this contribution, the waveform measurement technique will be briefly outlined before the results and their implications for the LIU project and beam performance reach are discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP026
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPTS047 |
Space Charge Driven Resonances in the CERN PS |
3216 |
|
- F. Asvesta
NTUA, Athens, Greece
- H. Bartosik, A. Huschauer, Y. Papaphilippou
CERN, Meyrin, Switzerland
|
|
|
In the CERN Proton Synchrotron space charge driven resonances are excited around the operational working point due to the periodicity of the optics functions. In this paper, the resonances are studied using analytical methods, i.e. the evaluation of the resonance driving terms connected to the space charge potential of Gaussian distributions. Furthermore, the resonances are characterized in measurements and simulations for various beams. The beams considered are different in terms of brightness, in order to study the dependence of the resonance strength on the space charge force.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS047
|
|
About • |
paper received ※ 17 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THXPLM1 |
LHC Injectors Upgrade Project: Towards New Territory Beam Parameters |
3385 |
|
- M. Meddahi, R. Alemany-Fernández, H. Bartosik, G. Bellodi, J. Coupard, H. Damerau, G.P. Di Giovanni, F.B. Dos Santos Pedrosa, A. Funken, B. Goddard, K. Hanke, A. Huschauer, V. Kain, A.M. Lombardi, B. Mikulec, S. Prodon, G. Rumolo, R. Scrivens, E.N. Shaposhnikova
CERN, Geneva, Switzerland
|
|
|
The LHC injectors Upgrade (LIU) project aims at increasing the intensity and brightness in the LHC injectors in order to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring high availability and reliable operation of the injectors complex up to the end of the HL-LHC era (ca. 2035). This requires extensive hardware modifications and new beam dynamics solutions in the entire LHC proton and ion injection chains: the new Linac4, the Proton Synchrotron Booster, the Proton Synchrotron the Super Proton Synchrotron together with the ion PS injectors (the Linac3 and the Low Energy Ion Ring). All hardware modifications will be implemented during the 2019-2020 CERN accelerators shutdown. This talk would analyze the various project phases, share the lessons learned, and conclude on the expected beam parameter reach, together with the related risks.
|
|
|
Slides THXPLM1 [20.029 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THXPLM1
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|