TUPTS048 | Preliminary Study on the Injection System Upgrade for CSNS-II | 2037 |
|
||
Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210) The first phase of the China Spallation Neutron Source (CSNS-I) had completed the national acceptance in August, 2018. The physics design of the second phase (CSNS-II) has already begun. The CSNS-II accelerator upgrade contains three main components, including the Linac energy upgrade from 80 MeV to 300 MeV, injection system upgrade, and new Magnetic Alloy dual-harmonic cavity. In this paper, a preliminary study on the injection system upgrade had been done. A preliminary upgrade scheme for the injection system would be given. Furthermore, some preliminary simulation and calculation for the upgrade injection system had been carried out. The analysis results showed that most injection parameters can preliminarily meet the requirements of accelerator power upgrade. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS048 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMP011 | Residual Orbits Estimation of the Injection Painting Bumps for CSNS | 2326 |
|
||
Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210) There are three bumps (one chicane bump and two painting bumps) in the injection system of the China Spallation Neutron Source (CSNS). They are the core parts of the injection system and the important guarantee that the Linac beam injecting into the rapid cycling synchrotron (RCS). During the beam commissioning, to check the effect of the residual orbits of the three bumps in the injection region was an important problem. In this paper, the residual orbits of BH and BV painting bumps were studied and estimated in the beam commissioning. The data analysis results showed that the residual orbits of BH and BV painting bumps were very small and they didn’t need to be corrected. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP011 | |
About • | paper received ※ 01 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMP012 | Beam Loss and the Stripping Efficiency Measurement for CSNS Injection System | 2329 |
|
||
Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210) The injection beam loss is the main beam loss of the rapid cycling synchrotron (RCS) for the China Spallation Neutron Source (CSNS). After the optimization of injection system during the beam commissioning, the current injection beam loss for CSNS/RCS is approximately 1%. There are several sources of injection beam loss. In order to distinguish these different sources, the stripping efficiency of the main stripping foil should be studied and measured accurately. In this paper, a scheme for the accurate measurement of the stripping efficiency for CSNS will be proposed and studied. It can not only reduce the injection beam loss, but also be used to estimate the operation state and lifespan of the main stripping foil accurately. This method will be applied in future beam commissioning. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP012 | |
About • | paper received ※ 30 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |