Author: Heilmann, M.
Paper Title Page
MOZZPLM1 Beam Commissioning of the Demonstrator Setup for the Superconducting Continuous Wave HIM/GSI-Linac 33
 
  • M. Miski-Oglu, K. Aulenbacher, V. Gettmann, T. Kürzeder
    HIM, Mainz, Germany
  • K. Aulenbacher, F.D. Dziuba
    IKP, Mainz, Germany
  • W.A. Barth, C. Burandt, V. Gettmann, M. Heilmann, T. Kürzeder, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • W.A. Barth, S. Yaramyshev
    MEPhI, Moscow, Russia
  • M. Basten, M. Busch, T. Conrad, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  During successful beam commissioning of the superconducting 15-gap Crossbar H-mode cavity at GSI Helmholtzzentrum für Schwerionenforschung heavy ions up to the design beam energy have been accelerated. The design acceleration gain of 3.5 MeV inside a length of less than 70 cm has been reached with full transmission for heavy ion beams of up to 1.5 particle mueA. The measured beam parameters confirm sufficient beam quality. The machine beam commissioning is a major milestone of the R&D for the superconducting heavy ion continuous wave linear accelerator HELIAC of Helmholtz Institute Mainz (HIM) and GSI developed in collaboration with IAP Goethe-University Frankfurt. The next step is the procurement and commissioning of so called ’Advanced Demonstrator’ - the first of series cryo module for the entire accelerator HELIAC. Results of further Demonstrator beam tests, as well as the status of the Advanced demonstrator project will be reported.  
slides icon Slides MOZZPLM1 [3.088 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOZZPLM1  
About • paper received ※ 29 April 2019       paper accepted ※ 24 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS015 FoS Cavity of the Alvarez 2.0 DTL as FAIR Injector 871
 
  • M. Heilmann, X. Du, L. Groening, S. Mickat, C. Mühle, A. Rubin, V. Srinivasan
    GSI, Darmstadt, Germany
 
  The Alvarez 2.0 DTL will be the new post-stripper DTL of the UNILAC at GSI. The existing GSI with its LINAC and SIS18 comprise the main operation injector chain for the Facility for Antiproton and Ion Research FAIR. The new Alvarez-DTL has an operation frequency of 108.4 MHz, an input energy of 1.358 MeV/u and the output energy is 11.4 MeV/u with a total length of 55 m. The presented FoS section will be part of the first cavity of the Alvarez 2.0 DTL. The FoS-cavity with 11 drift tubes (including quadrupole singlets) and a total length of 1.9 m will be copper plated in GSI for high power tests. The design of the quadrupole singlet magnet is finalized; a prototype of a fully functional magnet with drift tube and stems will be fabricated within a design study. Empty drift tubes and all components of the tank shall be delivered 2019 for first low level RF investigations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS015  
About • paper received ※ 13 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS024 Reconstruction of the Longitudinal Phase Portrait for the SC CW Heavy Ion HELIAC at GSI 898
 
  • S. Lauber, K. Aulenbacher, W.A. Barth, C. Burandt, F.D. Dziuba, V. Gettmann, T. Kürzeder, J. List, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher, F.D. Dziuba
    IKP, Mainz, Germany
  • W.A. Barth, C. Burandt, F.D. Dziuba, P. Forck, V. Gettmann, M. Heilmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu, A. Rubin, T. Sieber, S. Yaramyshev
    GSI, Darmstadt, Germany
  • H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  At the GSI Helmholtzzentrum für Schwerionenforschung (GSI) in Darmstadt, Germany, the HElmholtz LInear ACcelerator (HELIAC) is currently under construction. The HELIAC comprises superconducting multigap Crossbar H-mode (SC CH) cavities. The input beam is delivered by an already existing High Charge Injector (HLI). For the further development of the accelerator a detailed knowledge of the input beam parameters to the SC section is necessary. A method for beam reconstruction is incorporated, which provides for longitudinal beam characteristics using measurements with a beam shape monitor and a particle simulation code. This finalizes the investigations on 6D beam parameters, following previous measurements in transversal phase space. The reconstruction of the longitudinal phase portrait is presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS024  
About • paper received ※ 24 April 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS034 Advanced Beam Dynamics Design for the Superconducting Heavy Ion Accelerator HELIAC 928
SUSPFO024   use link to see paper's listing under its alternate paper code  
 
  • M. Schwarz, M. Basten, M. Busch, T. Conrad, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, C. Burandt, M. Heilmann, S. Lauber, J. List, A. Rubin, S. Yaramyshev
    GSI, Darmstadt, Germany
  • K. Aulenbacher, W.A. Barth, C. Burandt, F.D. Dziuba, V. Gettmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu
    HIM, Mainz, Germany
  • S. Lauber, J. List
    KPH, Mainz, Germany
 
  Funding: Work supported by BMBF contr. No. 05P18RFRB1, EU Framework Programme H2020 662186 (MYRTE) and HIC for FAIR
The standalone superconducting (SC) continuous wave (CW) heavy ion linac HELIAC (HElmholtz LInear ACcelerator) is a common project of GSI and HIM under key support of IAP Frankfurt and in collaboration with Moscow Engineering Physics Institute (MEPhI) and Moscow Institute for Theoretical and Experimental Physics (KI-ITEP). It is intended for future experiments with heavy ions near the Coulomb barrier within super-heavy element (SHE) research and aims at developing a linac with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with minimum energy spread. In 2017 the first superconducting section of the linac has been successfully commissioned and extensively tested with beam at GSI. In the light of experience gained in this research so far, the beam dynamics layout for the entire linac has recently been updated and optimized with particular emphasis on realistic assumptions of cavity gap and drift lengths as well as gap voltage distributions for CH3’CH11.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS034  
About • paper received ※ 30 April 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB014 Further RF Measurements on the Superconducting 217 MHz CH Demonstrator Cavity for a CW Linac at GSI 2826
 
  • F.D. Dziuba, K. Aulenbacher, W.A. Barth, C. Burandt, V. Gettmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu
    HIM, Mainz, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, C. Burandt, V. Gettmann, M. Heilmann, T. Kürzeder, S. Lauber, J. List, M. Miski-Oglu, J. Salvatore, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • M. Basten, M. Busch, T. Conrad, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • S. Lauber, J. List
    KPH, Mainz, Germany
 
  Funding: Work supported by GSI, HIM, BMBF Contr. No. 05P18UMRB2
Recently, the first section of the superconducting (sc) continuous wave (cw) Linac has been extensively tested with heavy ion beam from the GSI High Charge State Injector (HLI). During this testing phase, the reliable operability of 217 MHz multi gap crossbar-H-mode (CH) cavities has been successfully demonstrated. The sc 217 MHz CH cavity (CH0) of the demonstrator setup accelerated heavy ions up to the design beam energy and even beyond at high beam intensities and full transmission. This worldwide first beam test with a sc CH cavity is a major milestone on the way realizing the entire sc cw Linac project. In this contribution further RF measurements on the cavity are presented providing full characterization of the RF structure.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB014  
About • paper received ※ 26 April 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)