Paper |
Title |
Page |
MOPTS030 |
Characterisation and First Beam Line Tests of the Elbe Stripline Kicker |
918 |
|
- Ch. Schneider, A. Arnold, M. Freitag, J. Hauser, P. Michel
HZDR, Dresden, Germany
|
|
|
The linac based CW electron accelerator ELBE operates different secondary beamlines one at a time. For the future different end stations should be served simultaneously, hence specific bunch patterns have to be kicked into different beam-lines. The variability of the bunch pattern and the frequency resp. switching time are one of the main arguments for a stripline-kicker. A design with two tapered active electrodes and two ground fenders was optimized in time and frequency domain with the software package CST. From that a design has been transferred into a construction and was manufactured. The prototype has been tested in the laboratory and installed in the ELBE beam line. The presentation summarises the recent results and the first beam line test.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS030
|
|
About • |
paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|