Author: Harada, K.
Paper Title Page
MOPGW048 Design Study of an Electron Storage Ring for the Future Plan of Hiroshima Synchrotron Radiation Center. 200
 
  • S. Matsuba, M. Katoh, K.S. Shimada
    HSRC, Higashi-Hiroshima, Japan
  • K. Harada
    KEK, Ibaraki, Japan
  • K. Kawase
    QST, Tokai, Japan
 
  Hiroshima synchrotron radiation center equips a 700 MeV electron storage ring nicknamed HiSOR. It has been operated for more than 20 years. The emittance of HiSOR is 400 nm, which is larger by one or more orders of magnitude than typical modern synchrotron light sources. Therefore, as the future plan of the facility, a new low emittance storage ring is desired. Several designs have been examined. In the newest version, we have selected the lattice structure similar to ASTRID 2 compact light source in Aarhus University, Denmark. The design goal is the energy of around 500 MeV, the circumference shorter than 50 m and the emittance smaller than 10 nm with straight sections for undulators more than 4. In this conference, we report the latest result from the design study.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW048  
About • paper received ※ 01 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPGW036 1 mA Stable Energy Recovery Beam Operation with Small Beam Emittance 1482
 
  • T. Obina, D.A. Arakawa, M. Egi, T. Furuya, K. Haga, K. Harada, T. Honda, Y. Honda, T. Honma, E. Kako, R. Kato, H. Kawata, Y. Kobayashi, Y. Kojima, T. Konomi, H. Matsumura, T. Miura, T. Miyajima, S. Nagahashi, H. Nakai, N. Nakamura, K. Nakanishi, K.N. Nigorikawa, T. Nogami, F. Qiu, H. Sagehashi, H. Sakai, S. Sakanaka, M. Shimada, M. Tadano, T. Takahashi, R. Takai, O.A. Tanaka, Y. Tanimoto, T. Uchiyama, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
  • R. Hajima, R. Nagai, M. Sawamura
    QST, Tokai, Japan
  • N. Nishimori
    National Institutes for Quantum and Radiological Science and Technology (QST), Sayo-cho, Japan
 
  A compact energy-recovery linac (cERL) have been operating since 2013 at KEK to develop critical components for ERL facility. Details of design, construction and the result of initial commissioning are already reported*. This paper will describe the details of further improvements and researches to achieve higher averaged beam current of 1 mA with continuous-wave (CW) beam pattern. At first, to keep the small beam emittance produced by 500 kV DC-photocathode gun, tuning of low-energy beam transport is essential. Also, we found some components degrades the beam quality, i.e., a non-metallic mirror which disturbed the beam orbit. Other important aspects are the measurement and mitigation of the beam losses. Combination of beam collimator and tuning of the beam optics can improve the beam halo enough to operate with 1 mA stably. The cERL has been operated with beam energy at 20 MeV or 17.5 MeV and with beam rep-rate of 1300 MHz or 162.5 MHz depending on the purpose of experiments. In each operation, the efficiency of the energy recovery was confirmed to be better than 99.9 %.
* S. Sakanaka, et.al., Nucl. Instr. and Meth. A 877 (2017)197, https://doi.org/10.1016/j.nima.2017.08.051
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW036  
About • paper received ※ 14 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMP012 New Industrial Application Beamline for the cERL in KEK 3475
 
  • Y. Morikawa, K. Haga, M. Hagiwara, K. Harada, N. Higashi, T. Honda, Y. Honda, M. Hosumi, Y. Kamiya, R. Kato, H. Kawata, Y. Kobayashi, H. Matsumura, C. Mitsuda, T. Miura, T. Miyajima, S. Nagahashi, N. Nakamura, K.N. Nigorikawa, T. Nogami, T. Obina, H. Sagehashi, H. Sakai, M. Shimada, M. Tadano, R. Takai, H. Takaki, O.A. Tanaka, Y. Tanimoto, A. Toyoda, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
 
  The new beam line for the industrial applications is constructed at the cERL (compact Energy Recovery LINAC) in KEK. In these applications, only north straight sections of cERL consisting of injector and main LINAC will be used. The test for the radio isotope production and electron beam irradiation for the materials are firstly planned with very small beam current without energy recovery.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPMP012  
About • paper received ※ 11 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)