Author: Gougnaud, F.
Paper Title Page
WEPRB010 RF Power Test of the Rebuncher for Saraf-Linac 2815
 
  • L. Zhao, R. Berthier, F. Gougnaud, P. Guiho, N. Solenne, D. Uriot, X.W. Zhu
    CEA-DRF-IRFU, France
  • R. Braud, D. Chirpaz-Cerbat, J. Dumas, R.D. Duperrier, F. Gohier, T.J. Joannem, S. Ladegaillerie, C. Marchand, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • M. Di Giacomo, J.F. Leyge, M. Michel
    GANIL, Caen, France
  • B. Kaizer, L. Weissman
    Soreq NRC, Yavne, Israel
 
  Funding: SNRC
Three normal conducting rebunchers will be installed at the Medium Energy Beam Transport (MEBT) of the SARAF-LINAC phase II [saraf]. The MEBT line is designed to follow a 1.3 MeV/u RFQ, is about 5 m long, and contains three 176 MHz rebunchers providing a field integral of 105 kV. CEA is in charge of the design and fabrication of the Cu plated stainless steel, 3-gap rebuncher. The high power tests and RF conditioning have been successfully performed at the CEA Saclay on the first cavity. A solid state power amplifier, which has been developed by SNRC and has been used for the RF tests. The cavity has shown a good performance according to calculations, regarding the dissipated power, peak temperatures and coupling factor. RF conditioning was started with a duty cycle of 1\% and increased gradually until continuous wave (CW), which is the nominal working mode in SARAF-LINAC.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB010  
About • paper received ※ 09 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS116 The SARAF-LINAC Project 2019 Status 4352
 
  • N. Pichoff, R.D. Duperrier, G. Ferrand, B. Gastineau, F. Gougnaud, M. Jacquemet, C. Madec, O. Piquet, Th. Plaisant, F. Senée, D. Uriot
    CEA-IRFU, Gif-sur-Yvette, France
  • D. Berkovits, J. Luner, A. Perry, E. Reinfeld
    Soreq NRC, Yavne, Israel
 
  SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC solenoid-Package have been tested recently. Meanwhile, the cryomodules technical specifications have been written and called for tender. This paper presents the status of the SARAF-LINAC Project at April 2019.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS116  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)