Paper |
Title |
Page |
TUPGW011 |
Status of the PETRA IV project |
1404 |
|
- I.V. Agapov, R. Bacher, M. Bieler, R. Bospflug, R. Brinkmann, Y.-C. Chae, H.C. Chao, H.T. Duhme, M. Ebert, H.-J. Eckoldt, H. Ehrlichmann, X.N. Gavaldà, M. Hüning, U. Hurdelbrink, J. Keil, J. Klute, M. Körfer, B. Krause, G. Kube, W. Leemans, L. Lilje, F. Obier, A. Petrov, N. Plambeck, J. Prenting, G.K. Sahoo, H. Schlarb, M. Schlösser, F. Schmidt-Föhre, M. Schmitz, C.G. Schroer, T. Tempel, M. Thede, M. Tischer, R. Wanzenberg, E.F. Weckert, T. Wilksen, K. Wittenburg, J.X. Zhang
DESY, Hamburg, Germany
|
|
|
Since 2016 DESY has been pursuing R&D towards upgrading its PETRA synchrotron light source to a fourth-generation machine, PETRA IV, which is expected to start operation in 2027. The conceptual design of a 6 GeV seven-bend-achromat-based lattice with an approx. 10pm emittance along with critically important technical systems has been completed. We will present the status of the project, the expected parameter space of the facility, and lattice design and beam dynamics issues for the main ring.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW011
|
|
About • |
paper received ※ 13 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPGW018 |
PETRA IV Study with Non-Interleaved Sextupole Scheme |
1430 |
|
- H.C. Chao, R. Brinkmann, X.N. Gavaldà
DESY, Hamburg, Germany
|
|
|
This study is an attempt to design PETRA IV storage ring, which is an upgrade from PETRA III toward diffraction-limit synchrotron light source, based on the non-interleaved sextupole scheme. The lattice is constructed by mixing different types of cells. There are two basic building blocks. The double minus identity (DMI) cell dedicated for the chromaticity correction with non-interleaved sextupoles is tightly built up, while the combined function FODO cell with dispersion suppressors provides straights with small beta functions ideally for undulators. In addition, the hybrid section including a 10-m long super insertion device (ID) is custom-made to adapt to DESY’s current site plan. The beam dynamic behaviors are simulated and discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW018
|
|
About • |
paper received ※ 18 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPGW029 |
The Injection System and the Injector Complex for PETRA IV |
1465 |
|
- J.X. Zhang, I.V. Agapov, H. Ehrlichmann, X.N. Gavaldà, M. Hüning, J. Keil, F. Obier, M. Schmitz, R. Wanzenberg
DESY, Hamburg, Germany
|
|
|
PETRA IV project is to upgrade PETRA III to a synchrotron radiation source with an ultra-low emittance. Due to the small dynamic aperture of the PETRA IV storage ring, a horizontal on-axis injection is prepared. In this paper, the preliminary study of the injection scheme is described. To meet the requirements of the on-axis injection, a plan of a new injector complex, including the Gun, the LINAC and the accumulator is shown in this paper. Several options are discussed in this paper, too.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPGW029
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|