Paper | Title | Page |
---|---|---|
MOPRB076 | CBETA Beam Commissioning Results | 748 |
|
||
We report on the first results of commissioning CBETAwith a fully closed return loop. We repeat much of our early commissioning from the fractional arc test, namely setting up the injection system, calibrating the main linac, and steering the beam through the first splitter line. Most importantly, first results from sending the beam all the way through the FixedField Alternating gradient permanent magnet return arc are described. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB076 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEXXPLM3 |
Photocathodes Research Activities for High Brigtheness Beams, Spin Polarized Sources and Large Area Photon Detectors at Cornell University | |
|
||
Funding: NSF award no. PHY-1549132, DOE awards no. DE-SC0011643 and DE-SC0019122 We will a give broad description of recent results from Cornell University on improving the state of the art in the production of high brightness photoemitted electron beams for future light sources and ultrafast electron scattering. We will also discuss recent results on improving the lifetime of photocathode for spin polarized electron beam and on the production of large area photocathodes for single photon detection applications |
||
![]() |
Slides WEXXPLM3 [7.384 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |