Hardware Commissioning of the Renovated PIAVE Injector at INFN-LNL |
949 |
|
- G. Bisoffi, L. Bellan, J. Bermudez, E. Bissiato, D. Bortolato, F. Chiurlotto, M. Comunian, T. Contran, A. Facco, E. Fagotti, P. Francescon, A. Friso, A. Galatà, C.S. Gallo, M.G. Giacchini, M. Lollo, D. Martini, M.O. Miglioranza, P. Modanese, M. Montis, E. Munaron, G. Nigrelli, S. Pavinato, M. Pengo, A. Pisent, M. Poggi, L. Pranovi, M. Rossignoli, D. Scarpa
INFN/LNL, Legnaro (PD), Italy
- V. Andreev
ITEP, Moscow, Russia
- M.A. Bellato
INFN- Sez. di Padova, Padova, Italy
|
|
|
During 2018, the PIAVE superconducting linac injector at INFN-LNL, based on superconducting RFQs and two cryomodules with quarter wave resonators, underwent a renovation plan. This operation was strictly related to the one carried out on ALPI [1], which will become a post-accelerator for both stable and exotic beams in a near future. PIAVE Quarter Wave Resonator (QWR) cryomod-ules, in operation since 2006, were moved to ALPI to be used for the acceleration of both stable beams and future exotic beams delivered from the cyclotron target-ion-source station, after appropriate purification, charge breeding and pre-acceleration stages. In order to cope with the removal of the two QWR cryomodules in PIAVE, a newly designed 80 MHz room temperature buncher was designed, built and tested: the buncher is required so as to match the longitudinal phase space between PIAVE su-perconducting RFQs (SRFQ1 and SRFQ2) and ALPI. In the same period, substantial refurbishments on the ECR ion source platform were carried out, in particular on its infrastructure and safety equipment. A problem on an electronic component on SRFQ2, though quickly fixed, delayed beam commissioning of the PIAVE injector, which will start at the end of May 2019.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS042
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPGW030 |
Towards the First Beams from the ADIGE Injector for the SPES Project |
3647 |
|
- A. Galatà, L. Bellan, J. Bermudez, G. Bisoffi, D. Bortolato, M. Comunian, A. Conte, M. De Lazzari, P. Francescon, F. Gelain, D. Marcato, M.O. Miglioranza, M.F. Moisio, E. Munaron, S. Pavinato, D. Pedretti, A. Pisent, M. Roetta, C.R. Roncolato, M. Rossignoli, G. Savarese
INFN/LNL, Legnaro (PD), Italy
- V. Andreev
ITEP, Moscow, Russia
- J. Angot, D. Bondoux, T. Thuillier
LPSC, Grenoble Cedex, France
- M.A. Bellato
INFN- Sez. di Padova, Padova, Italy
|
|
|
The ADIGE (Acceleratore Di Ioni a Grande carica Esotici) injector of the SPES (Selective Production of Exotic Species) project is now in an advanced phase of installation. Its main components have been designed following particular needs of the project: first, an Electron Cyclotron Resonance (ECR)-based Charge Breeder (SPES-CB), to boost the charge states of the radioactive ions produced at SPES and allow their post-acceleration. Then, a stable 1+ source and a complete electrostatic beam line to characterize the SPES-CB. Finally, a unique Medium Resolution Mass Spectrometer (MRMS, R=1/1000), mounted on a high voltage platform downstream the SPES-CB, to clean the radioactive beam from the contaminants induced by the breeding stage. This contribution describes the status of the injector, in particular the installation of the platform housing the MRMS, the access and safety system adopted and the first beams to be extracted from the stable 1+ source.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW030
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|