Author: Furukawa, K.
Paper Title Page
MOPMP002 Linac and Damping Ring Designs for the FCC-ee 420
 
  • S. Ogur, K. Oide, Y. Papaphilippou, L. Rinolfi, F. Zimmermann
    CERN, Geneva, Switzerland
  • A.M. Barnyakov, A.E. Levichev, P.V. Martyshkin, D.A. Nikiforov
    BINP SB RAS, Novosibirsk, Russia
  • I. Chaikovska, R. Chehab
    LAL, Orsay, France
  • K. Furukawa, N. Iida, T. Kamitani, F. Miyahara, K. Oide
    KEK, Ibaraki, Japan
  • E.V. Ozcan
    Bogazici University, Bebek / Istanbul, Turkey
  • S.M. Polozov
    MEPhI, Moscow, Russia
  • L. Rinolfi
    ESI, Archamps, France
  • F. Yaman
    IZTECH, Izmir, Turkey
 
  We report the design of the pre-injector chain for the Future Circular e+ e Collider (FCC-ee) system. The electron beam from a low-emittance RF gun is accelerated by an S-band linac up to 6 GeV. A damping ring at 1.54 GeV is required for emittance cooling of the positron beam. The intermediate energy step from the exit of the S-band linac at 6 GeV to the 20 GeV injection energy of the top-up booster can be provided by the modified Super Proton Synchrotron (SPS), serving as a pre-booster ring (PBR). An alternative option to reach 20 GeV energy would be to extend the S-band linac with a C- or X-band linac. An overall cost optimisation will determine the choice of the final configuration. Beam loss and emittance dilution in the linac due to space charge effects, wakefields, and misalignment of accelerator components can be mitigated by RF phasing and orbit steering. Start-to-end simulations examine the beam transport through the linac up to either 6 GeV or 20 GeV. The results indicate large design margins. Simulations of the beam dynamics in the damping ring (DR) demonstrate a sufficiently large momentum acceptance. Effects of intrabeam scattering and electron cloud instability in the DR are also studied.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPMP002  
About • paper received ※ 13 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMP003 Positron Source for FCC-ee 424
 
  • I. Chaikovska, R. Chehab, A. Faus-Golfe, Y. Han
    LAL, Orsay, France
  • A. Apyan
    ANSL, Yerevan, Armenia
  • Y. Enomoto, K. Furukawa, T. Kamitani, F. Miyahara, M. Satoh, Y. Seimiya, T. Suwada
    KEK, Ibaraki, Japan
  • P.V. Martyshkin
    BINP SB RAS, Novosibirsk, Russia
  • S. Ogur, K. Oide, Y. Papaphilippou, L. Rinolfi, P. Sievers, F. Zimmermann
    CERN, Meyrin, Switzerland
 
  The FCC-ee is a high-luminosity, high-precision circular collider to be constructed in a new 100 km tunnel in the Geneva area. The physics case is well established and the FCC-ee operation is foreseen at 91 GeV (Z-pole), 160 GeV (W pair production threshold), 240 GeV (Higgs resonance) and 365 GeV (t-tbar threshold). Due to the large 6D production emittance and important thermal load in the production target, the positron injector, in particular the positron source, is one of the key elements of the FCC-ee, requiring special attention. To ensure high reliability of the positron source, conventional and hybrid targets are currently under study. The final choice of the positron target will be made based on the estimated performances. In this framework, we present a preliminary design of the FCC-ee positron source, with detailed simulation studies of positron production, capture and primary acceleration.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPMP003  
About • paper received ※ 03 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPGW038 Beam Control and Monitors for the Spiral Injection Test Experiment 2557
SUSPFO042   use link to see paper's listing under its alternate paper code  
 
  • M.A. Rehman
    Sokendai, Ibaraki, Japan
  • K. Furukawa, H. Hisamatsu, T. Mibe, H. Nakayama, S. Ohsawa
    KEK, Ibaraki, Japan
  • H. Iinuma
    Ibaraki University, Hitachi, Ibaraki, Japan
 
  A new experiment at J-PARC (E34) is under construction in order to measure the muon’s g-2 to unprecedented precision of 0.1 ppm and electric dipole moment up to the sensitivity of 10-21 e.cm in order to explore new physics beyond the standard model. A novel three-dimensional spiral injection scheme has been devised to inject and store the beam into a small diameter MRI-type storage magnet for E34. The new injection scheme features smooth injection with high storage efficiency for the compact storage magnet. However, spiral injection scheme is an unproven idea, therefore, a Spiral Injection Test Experiment (SITE) is underway to establish this injection scheme. The SITE is consist of 80 keV thermionic electron gun, two-meter-long beamline, and a solenoidal storage magnet. In order to match the beam with the solenoidal field, several optical elements have been placed on the beamline to control the beam phase space. The DC electron beam spiral track has been confirmed by the de-excitation of the nitrogen gas in the vacuum chamber of the storage magnet. A current monitor system has been developed in order to extract the beam current and geometrical information of three-dimensional trajectory. An electric chopper system to produce the pulsed beam and beam monitors to detect the pulsed beam will also be discussed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW038  
About • paper received ※ 01 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)