Paper |
Title |
Page |
MOPTS006 |
Final Results of the SPIRAL2 Injector Commissioning |
848 |
|
- R. Ferdinand, M. Di Giacomo, H. Franberg, J.-M. Lagniel, G. Normand, A. Savalle
GANIL, Caen, France
- D. Uriot
CEA-DRF-IRFU, France
|
|
|
The SPIRAL2 injector, made up of a 5 mA p-d ion source, a 1 mA heavy ion source (up to A/Q = 3) and a CW 0.75 MeV/u RFQ, has been commissioned in parallel with the superconducting linac installation. This com-missioning is successfully completed now and the Diag-nostic plate (D-plate) used to characterize the injector beams is removed. This paper presents the results ob-tained with the reference particles (H+, 4He2+, 18O6+ and 40Ar14+) and a comparison with the simulations. The connexion to the SC linac and the future linac beam commissioning is briefly described.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS006
|
|
About • |
paper received ※ 12 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPRB007 |
RF Commissioning of the SPIRAL2 RFQ in CW Mode and Beyond Nominal Field |
2804 |
|
- M. Di Giacomo, R. Ferdinand, H. Franberg, J.-M. Lagniel, G. Normand
GANIL, Caen, France
- M. Desmons, P. Galdemard, Y. Lussignol, O. Piquet, S. Sube
CEA-DRF-IRFU, France
|
|
|
The SPIRAL2 RFQ was recently successfully commissioned at nominal voltage of 114 kV, corresponding to 1.65 Kilpatrick factor. The paper describes limitations of the RFQ main subsystems, cavity conditioning difficulties, as well as changes implemented in the LLRF and automatic procedures to simplify turn on and operation of the whole system.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB007
|
|
About • |
paper received ※ 26 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|