Paper |
Title |
Page |
MOPTS087 |
Transverse Emittance Studies at Extraction of the CERN PS Booster |
1058 |
|
- F. Antoniou, S.C.P. Albright, F. Asvesta, H. Bartosik, G.P. Di Giovanni, V. Forte, M.A. Fraser, A. Garcia-Tabares, A. Huschauer, B. Mikulec, T. Prebibaj, A. Santamaría García, P.K. Skowroński
CERN, Meyrin, Switzerland
- F. Asvesta
NTUA, Athens, Greece
- T. Prebibaj
National Technical University of Athens, Zografou, Greece
|
|
|
Transverse emittance discrepancy in the beam transfer between the Proton Synchrotron Booster (PSB) and the Proton Synchrotron (PS) is observed in operational conditions for the LHC beams at CERN. The ongoing LHC Injectors Upgrade (LIU) project requires a tight budget for beam degradation along the injector chain and therefore the reason for this emittance discrepancy needs to be understood. Systematic measurements have been performed for various beam characteristics (beam intensity, transverse and longitudinal emittance). In this paper, a comparison between the emittance measurements using all available beam instrumentation with different emittance computation algorithms is presented. The results are compared to measurements at PS injection. Furthermore, the impact on the LIU project requirements for the emittance preservation along the LHC Injectors Complex is discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS087
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS100 |
Transverse Emittance Measurement in the CERN Proton Synchrotron in View of Beam Production for the High-Luminosity LHC |
1106 |
SUSPFO107 |
|
|
- E. Senes, J. Emery, V. Forte, M.A. Fraser, A. Guerrero, A. Huschauer, F. Roncarolo, J.L. Sirvent, P.K. Skowroński, F. Tecker
CERN, Meyrin, Switzerland
|
|
|
In the framework of the LHC Injectors Upgrade project the improvements required to achieve the parameters of the future beams for the High-Luminosity LHC are being studied and implemented. In order to deliver high brightness beams, control over the beam intensity and emittance is fundamental. Therefore, a highly accurate and reliable transverse emittance measurement is essential. Presently at the CERN Proton Synchrotron, the only operationally available emittance monitors not impacting the facility beam production are the flying wire scanners used to measure the circulating beam profile. The wire scanners will be replaced with a new generation in the next two years and a prototype is already installed. The prototype has been commissioned with beams featuring a wide range of intensities and emittances. This paper evaluates the performance of the prototype with respect to the present system via beam-based measurements. The transverse emittance measurement is discussed, considering the different potential error contributions to the measurement, such as knowledge of the machine optics and the dispersive contribution to the beam size.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS100
|
|
About • |
paper received ※ 02 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMP025 |
Matching Studies Between CERN PSB and PS Through Multi-Turn Beam Profile Acquisitions |
2367 |
|
- M.A. Fraser, Y. Dutheil, V. Forte, A. Guerrero, A. Huschauer, A. Oeftiger, S. Ogur, F. Roncarolo, E. Senes, F. Tecker
CERN, Geneva, Switzerland
|
|
|
In the framework of the LHC Injectors Upgrade (LIU) project, the investigation and quantification of the optics mismatch between the CERN Proton Synchrotron Booster (PSB) and PS is a crucial step in understanding the source of horizontal emittance growth between the two machines. Extensive studies were carried out to estimate the mismatch from single-pass measurements in the transfer line and to rematch the transfer line to reduce the dispersive mismatch at PS injection while keeping the betatron matching unaltered. This paper presents the results of the data analysis of more recent multi-turn measurements, which profited from a new turn-by-turn beam profile monitor in the PS ring, to assess the achieved level of matching and corresponding emittance growth. The results confirm the improved matching and demonstrate the feasibility of the multi-turn technique as a fundamental tool that will be important for the recommissioning of the renovated transfer line after Long Shutdown 2.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP025
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMP026 |
Emittance Dilution from the CERN Proton Synchrotron Booster’s Extraction Kickers |
2371 |
|
- M.A. Fraser, S.C.P. Albright, F. Antoniou, G.P. Di Giovanni, Y. Dutheil, V. Forte, A. Huschauer, F. Roncarolo
CERN, Meyrin, Switzerland
|
|
|
Understanding the different sources of emittance dilution along the LHC injector chain is an important part of providing the high brightness proton beams demanded by the LHC Injectors Upgrade (LIU) project. In this context, the first beam-based measurements of the magnetic waveforms of the Proton Synchrotron Booster’s (PSB) extraction kickers were carried out and used to quantify the transverse emittance blow-up during extraction and transfer to the Proton Synchrotron (PS). In this contribution, the waveform measurement technique will be briefly outlined before the results and their implications for the LIU project and beam performance reach are discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP026
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRB078 |
Performance Validation of the Existing and Upgraded PS Injection Kicker |
3994 |
|
- A. Ferrero Colomo, N. Ayala, A. Chmielinska, V. Forte, M.A. Fraser, T. Kramer, L. Sermeus
CERN, Geneva, Switzerland
|
|
|
The CERN PS injection kicker KFA45 will be upgraded in the framework of the LHC Injector Upgrade (LIU) project to allow for injection of 2 GeV proton beams. This paper summarizes the recent efforts to validate beam based waveform measurements, Pspice simulations and current waveform measurements by direct magnetic field measurements in the aperture of the existing system. The magnetic probe, associated measurement hardware design and measurements results are discussed. The paper concludes with a performance comparison and an outlook to future waveform tuning possibilities.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB078
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|