Paper |
Title |
Page |
MOPTS005 |
Status of the SPIRAL2 Project |
844 |
|
- P. Dolegieviez, R. Ferdinand, X. Ledoux, H. Savajols, F. Varenne
GANIL, Caen, France
|
|
|
The SPIRAL2 facility at GANIL will use a high-power p, d and heavy-ion superconducting linac for a wide range of applications including RIB production using both ISOL and in-flight techniques. The SPIRAL2 phase 1 deals with the high-power superconducting linac with two experimental areas called ’Neutrons for Science’ (NFS) and ’Super Separator Spectrometer’ (S3). The low energy experimental hall DESIR, under construction, will further increase the possibility for physics experiments. All the linac is installed, the commissioning of the injec-tor part (two sources and the A/Q = 3 RFQ) and two cool down of the entire superconducting linac have been suc-cessfully done. We are now in the linac beam commis-sioning phase. The project scope and parameters, the constraints linked to the safety rules, the accelerator, NFS, S3 and DESIR status and the planning will be pre-sented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS005
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS006 |
Final Results of the SPIRAL2 Injector Commissioning |
848 |
|
- R. Ferdinand, M. Di Giacomo, H. Franberg, J.-M. Lagniel, G. Normand, A. Savalle
GANIL, Caen, France
- D. Uriot
CEA-DRF-IRFU, France
|
|
|
The SPIRAL2 injector, made up of a 5 mA p-d ion source, a 1 mA heavy ion source (up to A/Q = 3) and a CW 0.75 MeV/u RFQ, has been commissioned in parallel with the superconducting linac installation. This com-missioning is successfully completed now and the Diag-nostic plate (D-plate) used to characterize the injector beams is removed. This paper presents the results ob-tained with the reference particles (H+, 4He2+, 18O6+ and 40Ar14+) and a comparison with the simulations. The connexion to the SC linac and the future linac beam commissioning is briefly described.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS006
|
|
About • |
paper received ※ 12 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPMP006 |
Cryogenic Tests of the SPIRAL2 LINAC Systems |
1240 |
|
- A. Ghribi, P.-E. Bernaudin, R. Ferdinand, A.V. Vassal
GANIL, Caen, France
|
|
|
Two full cool-down of the SPIRAL2 superconducting LINAC have been performed in 2017 and 2018 respectively, followed by a total of around 5 months of tests at 4 K. Several cool-down strategies were tested, in order to minimize 100 K effect on the SC cavities. Helium bath regulations (level and pressure) have been tested and optimized. Effects of pressure instabilities and coupling with the cryogenic plant have also been observed. Cryogenic performances of each cryomodule have been measured. Low-level RF measurements were also performed on all cavities and showed unidentified modulations at frequencies around 5Hz. These turned out to be thermoacoustic oscillations (TAO) on the cryogenic lines, which generate important pressure instabilities. Several solutions to remove TAO and cure these instabilities have been tested and one has been successfully deployed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP006
|
|
About • |
paper received ※ 14 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPTS007 |
SPIRAL2 RFQ Bunch Length and Longitudinal Emittance Measurements. |
1944 |
|
- G. Normand, M. Di Giacomo, R. Ferdinand, O. Kamalou, J.-M. Lagniel, A. Savalle
GANIL, Caen, France
- D. Uriot
CEA-DRF-IRFU, France
|
|
|
The SPIRAL2 RFQ is designed to accelerate light and heavy ions up to A/Q=3 in CW mode to 0.75MeV/u. During its commissioning, the bunch lengths measured using a Beam Extension Monitor were compared with simulations for different ion species (Proton, Helium, Oxygen, Argon). The longitudinal emittances measured using the 3 gradients method and a multiparticule optimization method were also compared successfully to the expected ones.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS007
|
|
About • |
paper received ※ 19 April 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPRB007 |
RF Commissioning of the SPIRAL2 RFQ in CW Mode and Beyond Nominal Field |
2804 |
|
- M. Di Giacomo, R. Ferdinand, H. Franberg, J.-M. Lagniel, G. Normand
GANIL, Caen, France
- M. Desmons, P. Galdemard, Y. Lussignol, O. Piquet, S. Sube
CEA-DRF-IRFU, France
|
|
|
The SPIRAL2 RFQ was recently successfully commissioned at nominal voltage of 114 kV, corresponding to 1.65 Kilpatrick factor. The paper describes limitations of the RFQ main subsystems, cavity conditioning difficulties, as well as changes implemented in the LLRF and automatic procedures to simplify turn on and operation of the whole system.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB007
|
|
About • |
paper received ※ 26 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|