Paper |
Title |
Page |
MOPTS046 |
Upgrade of the 3-MeV LINAC for Testing of Accelerator Components at J-PARC |
960 |
|
- Y. Kondo, K. Hirano, T. Ito, N. Kikuzawa, R. Kitamura, T. Morishita, H. Oguri, K. Ohkoshi, S. Shinozaki, K. Shinto
JAEA/J-PARC, Tokai-mura, Japan
- Z. Fang, Y. Fukui, K. Futatsukawa, K. Ikegami, T. Miyao, K. Nanmo, M. Otani, T. Shibata
KEK, Ibaraki, Japan
- T. Hori, Y. Nemoto, Y. Sato
Nippon Advanced Technology Co., Ltd., Tokai, Japan
- T. Ishiyama, Y. Sawabe
Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
- Y. Ito
Total Saport System Corp., Naka-gun, Ibaraki, Japan
- Y. Kato
Total Support Systems Corporation, Tokai-mura, Naka-gun, Ibaraki, Japan
- F. Kobayashi
ULVAC Human Relations, Ltd., Kanagawa, Japan
- D. Takahashi, R. Tasaki
KIS, Ibaraki, Japan
|
|
|
We are now upgrading a 3-MeV linac at J-PARC. The old 30-mA RFQ is replaced by a spare one of the J-PARC 50-mA RFQ. The ion source is same as the J-PARC linac’s, therefore, the peak beam current is upgraded from 30 mA to 50 mA. This 3-MeV linac will be used for development of various accelerator components, such as beam dyagnostics devices, laser charge exchange equipments, new MEBT buncher, and so on. In this paper, present status of this 3-MeV test linac is presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS046
|
|
About • |
paper received ※ 30 April 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPTS027 |
Progress of J-PARC LINAC Commissioning |
1990 |
|
- Y. Liu
KEK/JAEA, Ibaraki-Ken, Japan
- Z. Fang, K. Futatsukawa, T. Miyao, M. Otani, T. Shibata
KEK, Tokai, Ibaraki, Japan
- T. Ito, A. Miura, T. Morishita, K. Moriya, K. Okabe, J. Tamura
JAEA/J-PARC, Tokai-mura, Japan
|
|
|
After energy and intensity upgrade to 400MeV and 50mA respectively, J-PARC linac were ready for 1 MW beam power from RCS. J-PARC is now successfully operated at 50mA/400MeV for 500kW at neutron target, and on the way to 1MW. The next milestones 1.2 and 1.5MW from RCS are relying on feasibility and property of increase of peak current to 60 mA and the pulse width to 600us in linac. Beam studies were carried out at linac to study the initial beam parameters from ion source/RFQ, to find the optimized lattice and matching, to clarify beam loss source and to mitigate the loss/residue dose for the power upgrade.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS027
|
|
About • |
paper received ※ 17 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPTS022 |
The Realization of Iterative Learning Control for J-PARC LINAC LLRF Control System |
4155 |
|
- S. Li
J-PARC, KEK & JAEA, Ibaraki-ken, Japan
- Z. Fang, Y. Fukui, K. Futatsukawa, F. Qiu
KEK, Ibaraki, Japan
- Y. Sato, S. Shinozaki
JAEA/J-PARC, Tokai-mura, Japan
|
|
|
The beam current of j-parc linac was planned to increase to 60 mA. The stronger beam current will lead to higher beam loading effect. Due to the low Q factor of cavity in high β section of linac, the traditional PID feedback & feedforward control method may have to face huge challenges. In order to make the system run better at 60 mA, the iterative learning control (ILC) method was put forward to use in LLRF control system. All the ILC operations are done in EPICS-PC. By installing the PyEpics module, we can use python programs to realize the data interaction between EPICS system and PC and further realize the ILC algorithm. In this paper, the architecture of ILC methods will be introduced. The performance of ILC method will be reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS022
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|