Paper |
Title |
Page |
THPGW062 |
The New CERN East Area Primary and Secondary Beams |
3730 |
|
- E. Montbarbon, D. Banerjee, J. Bernhard, D. Brethoux, M. Brugger, B.D. Carlsen, N. Charitonidis, A. Ebn Rahmoun, S. Evrard, L. Gatignon, A. Gerbershagen, E. Harrouch, M. Lazzaroni, B. Rae, M.S. Rosenthal, M.W.U. Van Dijk
CERN, Geneva, Switzerland
|
|
|
The East Area is one of the intensely used facilities at CERN, now serving for over 56 years beams to more than 20 user teams and experiments for about 200 days of running each year. Besides primary proton and ion beams for the irradiation facilities IRRAD and CHARM, mixed secondary beams of hadrons, electrons and muons within a range of 0.5 GeV/c to 12 GeV/c are provided. The CERN management approved an upgrade and renovation of the full facility to meet reliably future beam test and physics requirements. We present new, flexible beam optics that will assure better purity of the secondary beams, even with the new possibility of highly pure electron, hadron or muon beams. The upgrade also includes a pulsed powering scheme with energy recovering power supplies and new laminated magnets that will reduce both power and cooling requirements. The renovation phase started already and first beams in the new facility will be delivered from 2021 on.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPGW062
|
|
About • |
paper received ※ 03 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPRB086 |
Design & Optimization of the Alignment Supports for the New Laminated Magnets for the CERN East Area Consolidation Project |
4020 |
|
- R. Vanhoutte, D. Brethoux, A. Ebn Rahmoun, S. Evrard, F.J. Harden, E. Harrouch, M. Lazzaroni, M. Lino Diogo dos Santos, R. Lopez, D.E. Nogtikov, J. Renedo Anglada
CERN, Meyrin, Switzerland
|
|
|
The East Area is one of CERNs experimental area, running since its foundation in 1958. Extracting a 24GeV proton beam from the Proton Synchrotron accelerator, the primary beam is divided into different secondary beams, serving various experiments and user’s facilities such as CLOUD, CHARM, IRRAD. Due to improved optics and an energy saving scheme, the facility will go under a renovation between 2019 and 2020, including the replacement of the magnets with new laminated ones to allow a cycled powering scheme. Those magnets need improved supports, and in some cases even a new design, to optimize the alignment operations in those areas. This article will mainly address the different proposed solutions for plug-in supports as well as for conventional ones.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB086
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|