Tests at High RF Power of the ESS Medium Beta Cryomodule Demonstrator |
1940 |
|
- P. Bosland, C. Arcambal, F. Ardellier, S. Berry, A. Bouygues, E. Cenni, G. Devanz, T. Hamelin, X. Hanus, O. Piquet, J.P. Poupeau, B. Renard, P. Sahuquet
CEA-DRF-IRFU, France
- C. Darve
ESS, Lund, Sweden
- P. Michelato
INFN/LASA, Segrate (MI), Italy
- G. Olivier, J.P. Thermeau
IPN, Orsay, France
|
|
|
CEA is in charge of the 30 elliptical medium and high-beta cryomodules to be installed in the ESS tunnel in Lund, Sweden. Before launching the assembly of the series cryomodules, CEA developed a medium-beta cryomodule technology demonstrator in a collaboration with IPNO, LASA and ESS. This paper briefly presents the cryomodule assembly and summarizes the main results of the high RF power tests performed in 2018 in a dedicated test stand in CEA Saclay. The main ESS requirements were reached: Eacc = 16.7 MV/m in cavities, Pforward = 1.1 MW in power couplers, RF pulses length = 3.6 ms at 14 Hz. The piezo tuners efficiently compensated the Lorentz forces detuning and could stabilize the accelerating field better than 1% over the full length of the expected ESS 2.86 ms beam pulse without any LLRF regulation system. Following this successful validation CEA started the assembly of the first ESS medium-beta series cryomodule
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS006
|
|
About • |
paper received ※ 06 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPRB009 |
Validation of the Series Power Couplers of the LIPAc SRF Linac |
2811 |
|
- H. Jenhani, N. Bazin, C. Boulch, S. Chel, G. Devanz, G. Disset, C. Servouin
CEA-IRFU, Gif-sur-Yvette, France
- I. Kirpitchev, J. Mollá, P. Méndez, D. Regidor, C. de la Morena
CIEMAT, Madrid, Spain
|
|
|
In the framework of the IFMIF/EVEDA project, the cryomodule of the Linear IFMIF Prototype Accelerator (LIPAc) will be assembled then tested at Rokkasho in 2019. Eight Series Power Couplers (PC) operating at 175 MHz were manufactured under a CEA contract, in order to equip this Cryomodule. They were all successfully RF conditioned up to 100 kW CW in TW and SW configurations. All the high RF power tests were performed under CIEMAT responsibility in BTESA Company premises, according to the CEA requirements. In order to fix difficulties encountered during the fab process, manufacturing and quality control have been analyzed in depth. Thanks to the corrective actions implemented, every PC reached the performances targeted for qualification. This paper will give details about this manufacturing phase and provide an overview of the obtained RF test results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB009
|
|
About • |
paper received ※ 09 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|