Author: Desmons, M.
Paper Title Page
WEPRB007 RF Commissioning of the SPIRAL2 RFQ in CW Mode and Beyond Nominal Field 2804
 
  • M. Di Giacomo, R. Ferdinand, H. Franberg, J.-M. Lagniel, G. Normand
    GANIL, Caen, France
  • M. Desmons, P. Galdemard, Y. Lussignol, O. Piquet, S. Sube
    CEA-DRF-IRFU, France
 
  The SPIRAL2 RFQ was recently successfully commissioned at nominal voltage of 114 kV, corresponding to 1.65 Kilpatrick factor. The paper describes limitations of the RFQ main subsystems, cavity conditioning difficulties, as well as changes implemented in the LLRF and automatic procedures to simplify turn on and operation of the whole system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB007  
About • paper received ※ 26 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS008 ESS RFQ: Construction Status and Power Couplers Qualification 855
 
  • O. Piquet, A.C. Chauveau, D. Chirpaz-Cerbat, M. Desmons, A.C. France, P. Hamel, B. Pottin
    CEA-IRFU, Gif-sur-Yvette, France
  • A. Dubois, A. Gaget, Y. Le Noa, L. Napoly, M. Oublaid, G. Perreu
    CEA-DRF-IRFU, France
 
  The 352 MHz Radio Frequency Quadrupole (RFQ) for the European Spallation Source ERIC (ESS) will be de-livered during 2019. It is provided by CEA, IRFU, Sac-lay/France. It consists of five sections with a total length of 4.6 m and accelerates the proton beam from 75 keV up to 3.6 MeV. It will be feed with 1.6 MW peak power through two coaxial loop couplers. This paper will present the manufacturing status of the five sections and the qualification test of the RF power couplers.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS008  
About • paper received ※ 07 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)