TUPTS038 The Operation Status of CSNS Front End 2024
 
  • Y.W. An, Y.J. Lv, H.F. Ouyang, Y.C. Xiao
    IHEP, Beijing, People’s Republic of China
  • X. Cao, W. Chen, T. Huang, H. Li, S. Liu, K. Xue
    IHEP CSNS, Guangdong Province, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China(11875271)
China spallation neutron source (CSNS), as the China’s first 100kW beam power pulsed neutron source, its operation target beam power is now larger than 50kW. During the beam power upgrading process of CSNS to 50kW from 2018 to 2019, many improvements have been made for the front end of CSNS. In this paper, the commissioning and improvement of front end as well as the laboratory construction are introduced. The improvements mainly focus on solving the stability of ion source and the spark of Radio Frequncy quadrupole (RFQ) caused by the pre-chopped beam into RFQ.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS038  
About • paper received ※ 08 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)