Paper |
Title |
Page |
MOPTS047 |
Radiation Measurement in the 1st Beam Commissioning Campaign of the LIPAc RFQ |
964 |
|
- K. Kondo, S. Kwon, K. Sakamoto, T. Shinya, M. Sugimoto
QST, Aomori, Japan
- L. Bellan, F. Grespan, F. Scantamburlo
INFN/LNL, Legnaro (PD), Italy
- P. Cara
IFMIF/EVEDA, Rokkasho, Japan
- H. Dzitko
F4E, Germany
- R. Heidinger
Fusion for Energy, Garching, Germany
- I. Podadera
CIEMAT, Madrid, Spain
|
|
|
The 1st proton beam acceleration of the Linear IFMIF Prototype Accelerator (LIPAc) through its novel RFQ was succeeded on 13th June 2018. Addition to plenty of beam diagnostics equipped in the beam line, we prepared some radiation detectors placed around the accelerator in order to acquire supplemental information of the beam, as an indirect measurement. In the first day of the beam injec-tion to the RFQ, the gamma-rays corresponding to certain excited states of Al of the low power beam dump were successfully detected by a LaBr3(Ce) scintillation detec-tor. Some neutrons, which would originate from the inter-action of protons with Cu somewhere, were also ob-served. These results proved that the beam was certainly accelerated up to about 2.5 MeV, and provided us a defin-itive confidence that the RFQ was working appropriately from the very beginning of the commissioning. Also, the comparison of the radiation yields with the RFQ trans-mission provided additional information on the beam energy distribution.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS047
|
|
About • |
paper received ※ 23 May 2019 paper accepted ※ 24 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS051 |
Lattice Design for 5MeV-125mA CW RFQ Operation in the LIPAc |
977 |
|
- Y. Shimosaki, A. Kasugai, K. Kondo, K. Sakamoto, M. Sugimoto
QST, Aomori, Japan
- L. Bellan, M. Comunian, E. Fagotti, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- B. Brañas Lasala, C. Oliver, I. Podadera
CIEMAT, Madrid, Spain
- P. Cara
IFMIF/EVEDA, Rokkasho, Japan
- N. Chauvin
CEA-IRFU, Gif-sur-Yvette, France
- G. Duglue, H. Dzitko
F4E, Germany
- R. Heidinger
Fusion for Energy, Garching, Germany
- H. Kobayashi, K. Takayama
KEK, Ibaraki, Japan
|
|
|
The installation and commissioning of the LIPAc are ongoing under the Broader Approach agreement, which is the prototype accelerator of the IFMIF for proof of princi-ple and design. The deuteron beam will be accelerated by the RFQ linac from 100 keV to 5 MeV during the com-missioning phase-B and by the SRF linac up to 9 MeV during the phase-C. The commissioning phase-B+ will be implemented between phase-B and C to complete the engineering validation of the RFQ linac before installing the SRF linac. The lattice for the deuteron beam of 5 MeV and 125 mA at the commissioning phase-B+ was designed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS051
|
|
About • |
paper received ※ 15 May 2019 paper accepted ※ 23 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|