Author: Capatina, O.
Paper Title Page
MOPTS092 Numerical and Experimental Evaluation of the DQW Crab Cavity Cryomodule Thermal Budget 1074
 
  • F. Carra, K. Brodzinski, E. Cano-Pleite, O. Capatina
    CERN, Meyrin, Switzerland
 
  Funding: Research supported by the HL-LHC project
One of the key devices of the HL-LHC project are SRF Crab Cavities. A cryomodule with two Double Quarter Wave (DQW) crab cavities has been fabricated at CERN in 2017 and successfully tested with beam in the Super Proton Synchrotron (SPS) in 2018. The aim of the present study is to present and compare the estimation of the thermal budget for the different components of the cryomodule, performed with numerical and semi-analytical methods, with the experimental measurements carried out on the cryomodule after installation in the SPS.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS092  
About • paper received ※ 12 April 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB098 Cryogenic RF Performance of Double-Quarter Wave Cavities Equipped with HOM Filters 3043
 
  • S. Verdú-Andrés, I. Ben-Zvi, Q. Wu, B.P. Xiao
    BNL, Upton, Long Island, New York, USA
  • I. Ben-Zvi
    Stony Brook University, Stony Brook, USA
  • G. Burt
    Cockcroft Institute, Lancaster University, Lancaster, United Kingdom
  • G. Burt, J.A. Mitchell
    Lancaster University, Lancaster, United Kingdom
  • R. Calaga, O. Capatina
    CERN, Meyrin, Switzerland
  • N.A. Huque, E.A. McEwen, H. Park, T. Powers
    JLab, Newport News, Virginia, USA
  • Z. Li, A. Ratti
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by US DOE through BSA LLC under contracts No. DE-AC02-98CH10886, No. DE-SC0012704, and the US LHC Accelerator Research Program (LARP) and by the EU HL-LHC Project.
Crab cavities are one of the several components included in the luminosity upgrade of the Large Hadron Collider (HL-LHC). The cavities have to provide a nominal deflecting kick of 3.4 MV per cavity while the cryogenic load per cavity stays below 5 W. Cold RF tests confirmed the required performances in bare cavities, with several cavities exceeding the required voltage by more than 50%. However, the first tests of a Double-Quarter Wave (DQW) cavity with one out of three HOM filters did not reach the required voltage. The present paper describes the studies and tests conducted on a DQW cavity with HOM filter to understand the limiting factor. The recipe to meet the performance specification and exceed the voltage requirement by more than 35% is discussed.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB098  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)