Author: Cano-Pleite, E.
Paper Title Page
MOPTS092 Numerical and Experimental Evaluation of the DQW Crab Cavity Cryomodule Thermal Budget 1074
 
  • F. Carra, K. Brodzinski, E. Cano-Pleite, O. Capatina
    CERN, Meyrin, Switzerland
 
  Funding: Research supported by the HL-LHC project
One of the key devices of the HL-LHC project are SRF Crab Cavities. A cryomodule with two Double Quarter Wave (DQW) crab cavities has been fabricated at CERN in 2017 and successfully tested with beam in the Super Proton Synchrotron (SPS) in 2018. The aim of the present study is to present and compare the estimation of the thermal budget for the different components of the cryomodule, performed with numerical and semi-analytical methods, with the experimental measurements carried out on the cryomodule after installation in the SPS.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS092  
About • paper received ※ 12 April 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)