Author: Calabretta, L.
Paper Title Page
TUPTS023 A CENTRAL REGION UPGRADE OF THE k800 SUPERCONDUCTING CYCLOTRON AT INFN-LNS 1975
 
  • G. D’Agostino, L. Calabretta, D. Rifuggiato
    INFN/LNS, Catania, Italy
  • W.J.G.M. Kleeven
    IBA, Louvain-la-Neuve, Belgium
 
  The Superconducting Cyclotron (CS) at INFN-LNS in Catania is currently under an upgrade process. The plan is to deliver beams of ions with mass number 𝐴 ≤ 40 with power up to 10 kW. This ambitious goal can be achieved increasing the efficiency of the injection and extraction processes. An extraction efficiency close to 100% is expected by extracting the specific ion beams from the CS by stripping and no longer by electrostatic deflectors. The beams are injected axially and bent onto the median plane with a spiral inflector. Currently, the injection efficiency stays around 15%, also including the effect of a drift buncher placed in the axial injection line. In order to increase the injection efficiency, the study of an upgraded CS central region is ongoing at INFN-LNS. In this paper, the results of simulations of beam tracking through the cyclotron axial bore, the spiral inflector, the central region and further up to the extraction system are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS023  
About • paper received ※ 29 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS050 Design and Analysis of the Cold Cathode Ion Source for 200 MeV Superconducting Cyclotron 2040
SUSPFO077   use link to see paper's listing under its alternate paper code  
 
  • S.W. Xu
    USTC, Hefei, Anhui, People’s Republic of China
  • L. Calabretta
    INFN/LNS, Catania, Italy
  • G. Chen, M. Xu
    ASIPP, Hefei, People’s Republic of China
  • O. Karamyshev, G.A. Karamysheva, G. Shirkov
    JINR, Dubna, Moscow Region, Russia
 
  SC200 is a superconducting isochronous cyclotron which generates 200 MeV, 400 nA proton beam for particle therapy. The cold-cathode-type Penning ion gauge (PIG) ion source for the internal ion source of SC200 has been selected as an alternative and preliminary designed. In this paper, design of ion source and test bench are demonstrated. Currently, the properties of ion source have been simulated for a variety of electric field distributions and magnetic field strengths. The secondary electron emission in electromagnetic field has been simulated. It provides reference for the optimization design of arc chamber. In addition, the sample of cold-cathode-type ion source has been tested on the test bench and extracted beam intensity has been measured over 200 μA.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS050  
About • paper received ※ 30 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB030 Commissioning of RF System of the 200 MeV Proton Cyclotron 2877
 
  • G. Chen, C. Chao, G. Liu, X.Y. Long, Z. Peng, C.S. Yu, X. Zhang, Y. Zhao
    ASIPP, Hefei, People’s Republic of China
  • L. Calabretta, A.C. Caruso
    INFN/LNS, Catania, Italy
  • O. Karamyshev, G.A. Karamysheva, G. Shirkov
    JINR, Dubna, Moscow Region, Russia
 
  Funding: (1) National Natural Science Foundation of China under grant No. 11775258, 11575237; (2) International Sci-entific and Technological Cooperation Project of An-hui (grant No. 1704e1002207).
The SC200 superconducting accelerator which is designed for proton therapy is currently under con-struction. The RF (Radio Frequency) system has been designed and constructed as a subsystem of the SC200. To verify the stability of the RF system, a high-power feeding test was performed for the cavity. This paper mainly reports on the overview of RF systems and the prelimary high-power commissioning, as well as the problems found and improvements made during the commissioning process. The results show that the RF system has initially achieved the designed goal, and each loop (amplitude, tuning, phase) can work effec-tively. The cavity can operate in a ~50 kW continuous wave state. Next, the formal RF conditioning will be carried out after the complete assembly of cyclotron, so as to confirm the cavity can run smoothly under 80 kW, which is part of the whole commissioning process.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB030  
About • paper received ※ 22 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)