Paper | Title | Page |
---|---|---|
MOPRB004 | The European Spallation Source Neutrino Super Beam Design Study | 582 |
|
||
Funding: This project is supported by the COST Action CA15139 EuroNuNet. It has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 777419. The discovery of oscillations and the latest progress in neutrino physics will make possible to observe for the first time a possible CP violation at the level of leptons. This will help to understand the disappearance of antimatter in the Universe. The ESSnuSB* project proposes to use the proton linac of the ESS currently under construction to produce a very intense neutrino Super Beam, in parallel with the spallation neutron production. The ESS linac is expected to deliver 5 MW average power, 2 GeV proton beam, with a rate of 14 Hz and pulse duration of 2.86 ms. By doubling the pulse rate, 5 MW power more can be provided for the production of the neutrino beam. In order to shorten the proton pulse duration to few μs requested by the neutrino facility, an accumulation ring is needed, imposing the use and acceleration of H− instead of protons in the linac. The neutrino facility also needs a separate target station with a different design than the one of the neutron facility. On top of the target, a hadron magnetic collecting device is needed in order to focus the emerging hadrons from the target and obtain an intense neutrino beam directed towards the neutrino detector. A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac, Nuclear Physics B, Vol 885, Aug 2014, 127-149, arXiv:1309.7022. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB004 | |
About • | paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPRB046 | Status of the ESSnuSB Accumulator Design | 666 |
|
||
Funding: This project is supported by the COST Action CA15139 EuroNuNet. It has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 777419. The 2.0 GeV, 5 MW proton linac for the European Spallation Source, ESS, will have the capacity to accelerate additional pulses and send them to a neutrino target, providing an excellent opportunity to produce an unprecedented high performance neutrino beam, the ESS neutrino Super Beam, ESSnuSB, to measure, with precision, the CP violating phase at the 2nd oscillation maximum. In order to comply with the acceptance of the target and horn systems that will form the neutrino super beam, the long pulses from the linac must be compressed by about three orders of magnitude with minimal particle loss, something that will be achieved through multi-turn charge-exchange injection in an accumulator ring. This ring will accommodate over 2·1014 protons, which means that several design challenges are encountered. Strong space charge forces, low-loss injection with phase space painting, efficient collimation, a reliable charge stripping system, and e-p instabilities are some of the important aspects central to the design work. This paper presents the status of the accumulator ring design, with multi-particle simulations of the injections procedure. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB046 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPRB013 | The ESSnuSB Target Station | 3831 |
|
||
Funding: This project is supported by the COST Action CA15139 EuroNuNet. It has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 777419. The ESSνSB project, recently granted by the EU H2020 programme for a 4-year design study, proposes to use the protons produced by the linac (2 GeV, 5 MW) of the European Spallation Source (ESS) currently in construction in Lund (Sweden) to deliver a neutrino super beam. It follows the studies made by the FP7 Design Study EUROν[1] (2008-2012), regarding future neutrino facilities. The primary proton beam line completing the linear accelerator will consist of one or several accumulator rings and a proton beam switchyard. The secondary beam line producing neutrinos will consist of a four-horn/target station, a decay tunnel and a beam dump. A challenging component of this project is the enormous target heat-load generated by the 5 MW proton beam. In order to reduce this heat-load there will be four targets, which will be hit in sequence by the compressed proton pulses, thereby reducing the beam power on each target to 1.25 MW. Following the EUROν studies, a packed bed of titanium spheres cooled with helium gas has become the baseline design for a Super Beam based on a 2-5 GeV proton beam with a power of up to 1 MW per target, with other targets being considered for comparison. The hadron collection will be performed by four hadron collectors (magnetic horns), one for each target. Each of these target/hadron-collector assemblies will receive proton pulses three times more frequently than in present projects, and by an average beam power of 1.25 MW, which is twice as high as in present neutrino projects. The feasibility of the target/horn station for the ESSνSB project is discussed here. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB013 | |
About • | paper received ※ 15 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |