Paper |
Title |
Page |
WEPTS118 |
Results of CEA Tests of SARAF Couplers Prototypes |
3382 |
|
- G. Ferrand, Y. Baron, S. Bouaziz, D. Chirpaz-Cerbat, R. Cubizolles, F. Gohier, S. Ladegaillerie, A. Lotode, C. Madec, G. Monnereau, N. Pichoff, O. Piquet
CEA-IRFU, Gif-sur-Yvette, France
- C. Boulch, E. Fayette, P. Guiho, Y. Lussignol, C. Servouin
CEA-DRF-IRFU, France
|
|
|
CEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 and 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz. The last two identical cryomodule will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The maximal required power to be transmitted to the beam is 11.4 kW for high-beta cavity couplers. This document presents the results of the coupler tests and conditioning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS118
|
|
About • |
paper received ※ 23 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPTS007 |
SARAF Equipped Cavity Test Stand (ECTS) at CEA |
852 |
|
- O. Piquet, C. Boulch, D. Chirpaz-Cerbat, G. Ferrand, F. Gohier, T.J. Joannem, G. Monnereau, Th. Plaisant
CEA-IRFU, Gif-sur-Yvette, France
- D. Braud, P. Carbonnier, P. Guiho, L. Maurice, J. Plouin, P. Sahuquet, N. Solenne
CEA-DRF-IRFU, France
- F. Gouit, A. Pérolat
CEA, Gif-sur-Yvette, France
|
|
|
CEA is committed to delivering a Medium Energy Beam Transfer line and a Super Conducting Linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3MeV to 35MeV or deuterons from 2.6 MeV to 40.1MeV. The SCL consists in 4 cryomodules separated by warm section housing beam diagnostics. The two first identical cryomodules hosts respectively 6 and 7 half-wave resonator (HWR) low beta (0.091) cavities 176MHz. In order to test the cavity with its tuner and coupler and validate some design consideration, the Equipped Cavity Test Stand (ECTS) has been designed and will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS007
|
|
About • |
paper received ※ 07 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPRB009 |
Validation of the Series Power Couplers of the LIPAc SRF Linac |
2811 |
|
- H. Jenhani, N. Bazin, C. Boulch, S. Chel, G. Devanz, G. Disset, C. Servouin
CEA-IRFU, Gif-sur-Yvette, France
- I. Kirpitchev, J. Mollá, P. Méndez, D. Regidor, C. de la Morena
CIEMAT, Madrid, Spain
|
|
|
In the framework of the IFMIF/EVEDA project, the cryomodule of the Linear IFMIF Prototype Accelerator (LIPAc) will be assembled then tested at Rokkasho in 2019. Eight Series Power Couplers (PC) operating at 175 MHz were manufactured under a CEA contract, in order to equip this Cryomodule. They were all successfully RF conditioned up to 100 kW CW in TW and SW configurations. All the high RF power tests were performed under CIEMAT responsibility in BTESA Company premises, according to the CEA requirements. In order to fix difficulties encountered during the fab process, manufacturing and quality control have been analyzed in depth. Thanks to the corrective actions implemented, every PC reached the performances targeted for qualification. This paper will give details about this manufacturing phase and provide an overview of the obtained RF test results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB009
|
|
About • |
paper received ※ 09 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|