Paper | Title | Page |
---|---|---|
WEPMP022 | Design and Construction of the CERN SPS Extraction Protection Elements for LIU | 2359 |
|
||
At CERN, the SPS synchrotron is equipped with two fast extraction channels towards the LHC. As a part of the LHC injector upgrade project (LIU), the protection devices upstream of the septa in both extraction channels will be upgraded. Various failure scenarios have been studied and presented in the past, but the definitive approach for the equipment protection upgrade for each channel has now been determined. This paper describes the consequences of the most significant failure scenarios and the impact of the heat deposition in the diluter. The resulting material stresses are evaluated. The detailed layout for the extraction protection equipment for each extraction channel is outlined. The final layout consists of a extended diluter in Long Straight Section (LSS) 6 (TPSG6) and the installation of an additional movable absorber (TPSC4) upstream of the quadrupole in front of the existing protection equipment in LSS 4. The detailed mechanical design of the TPSC4 and the construction status of both TPSC4 and TPSG6 are discussed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP022 | |
About • | paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMP024 | Alternative Material Choices to Reduce Activation of Extraction Equipment | 2363 |
|
||
At CERN, the Super Proton Synchrotron (SPS) is equipped with a resonant slow extraction system in Long Straight Section 2 (LSS2) towards the fixed target (FT) beam lines in the North Area. The extraction region provides the physics experiments with a quasi-DC flux of high-energy protons over a few seconds, which corresponds to tens of thousands of turns. The resonant slow extraction process provokes beam losses and is therefore the origin of radiation damage and the production of induced radioactivity in this region of the machine. This induced radioactivity imposed high constraints on the equipment design to be reliable to minimise the radiation exposure to personnel during machine maintenance. A detailed FLUKA model was developed in order to better understand the beam loss patterns, activation of the machine and to identify equipment components that could be optimised to reduce the residual dose related hazards. Simulations identified multiple alternative materials for extraction equipment components as well as shielding locations, which implementation could reduce residual activation hazards. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP024 | |
About • | paper received ※ 26 April 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMP031 | SPS Slow Extraction Losses and Activation: Update on Recent Improvements | 2391 |
|
||
Annual high intensity requests of over 1019 protons on target (POT) from the CERN Super Proton Synchrotron (SPS) Fixed Target (FT) physics program continue, with the prospect of requests for even higher, unprecedented levels in the coming decade. A concerted and multifaceted R&D effort has been launched to understand and reduce the slow extraction induced radioactivation of the SPS and to anticipate future experimental proposals, such as SHiP* at the SPS Beam Dump Facility (BDF)**, which will request an additional 4·1019 POT per year. In this contribution, we report on operational improvements and recent advances that have been made to significantly reduce the slow extraction losses, by up to a factor of 3, with the deployment of new extraction concepts, including passive and active (thin, bent crystal) diffusers and extraction on the third-integer resonance with octupoles. In light of the successful tests of the prototype extraction loss reduction schemes, an outlook and implications for future SPS FT operation will be presented.
* A. Golutvin et al., Rep. CERN-SPSC-2015-016 (SPSC-P-350), CERN, Geneva, Switzerland, Apr. 2015. ** M. Lamont et al., Rep. CERN-PBC-REPORT-2018-001, CERN, Geneva, Switzerland, 11 Dec 2018. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPMP031 | |
About • | paper received ※ 14 May 2019 paper accepted ※ 21 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPTS062 | Alternative Proposal for FCC-hh Extraction Septa | 4248 |
|
||
Challenging requirements are set for the FCC extraction septa magnets, notably for the magnetic field level, the septum thickness and the leak field. An alternative to the baseline FCC extraction layout with normal conducting Lambertson septa is proposed, consisting of a Superconducting Shield (SuShi) stage and a Truncated Cosine theta septa stage with the aim of reducing the necessary number of septa and installed length. The principal parameters of the septa are described and the feasibility discussed. Areas for study improvement are identified.
This paper is intended for publication in the PRAB special edition. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS062 | |
About • | paper received ※ 13 May 2019 paper accepted ※ 22 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |