Paper | Title | Page |
---|---|---|
WEPGW080 | Design of Resonant Stripline BPM for an IR-FEL Project at NSRL | 2665 |
|
||
Funding: Work supported by the National Science Foundation of China (11575181, 21327901, 11705203); X. Y. Liu was supported by the China Scholarship Council for a 2-year study at PSI (Grant No. 201706340057). This paper presents the design of a 476MHz resonant stripline beam position monitor (BPM) for an IR-FEL machine at NSRL. This type of BPM was developed based on stripline BPM by moving the coupling feedthrough closer to the short end downstream. This modification introduces a resonance that gives this BPM a better capability to detect lower beam currents compared to broadband devices like button and stripline BPM. Meanwhile, the change is small enough to use the same type of electronics [1-3]. In the following sections, the basic principle, nonlinear effect, sensitivity, the filtered sum and difference signals, and the mechanical design of this BPM will be mainly discussed. Email address: xiaoyu.liu@psi.ch |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW080 | |
About • | paper received ※ 10 May 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPRB021 | Commissioning of S-band Cavity Test Facility at Elettra for Conditioning of High Gradient Structures for the Fermi Linac Upgrade | 2846 |
|
||
FERMI is the seeded Free Electron Laser (FEL) user facility at Elettra laboratory in Trieste, operating in the VUV to soft X-rays spectral range. In order to extend the FEL spectral range to shorter wavelengths, a feasibility study for increasing the Linac energy from 1.5 GeV to 1.8 GeV is actually going on. A short prototype of a new High Gradient (HG) S-band accelerating structure has been built in collaboration with Paul Scherrer Institute (PSI). The new structures are intended to replace the present Backward Travelling Wave (BTW) sections and tailored to be operated at a gradient of 30 MV/m. For RF conditioning and high power testing of prototype, a Cavity Test Facility (CTF) is commissioned at FERMI. The test facility is equipped with RF pulse compressor system and a dedicated diagnostic for breakdown rate (BDR) measurements and events localization. In this paper we present in detail cavity test facility of FERMI and high power testing of the first prototype. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB021 | |
About • | paper received ※ 08 April 2019 paper accepted ※ 20 May 2019 issue date ※ 21 June 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |